Professional Documents
Culture Documents
Control Valve NIOC
Control Valve NIOC
NIOC
PARS OIL & GAS COMPANY
PPL/PPI CONSORTIUM
Rev. No
Date: Signature: 7 11-Sep-13 6 10-Jul-13 5 4 3 2 1 0 19-Jun-13 28-May-13 26-Apr-13 30-Mar-13 11-Jan-13 01-Jan-13
FOR APPROVAL FOR APPROVAL FOR APPROVAL FOR APPROVAL FOR APPROVAL FOR APPROVAL FOR APPROVAL FOR APPROVAL
Rev
DATE
DESCRIPTION
This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
NATIONAL IRANIAN OIL COMPANY SOUTH PARS GAS FIELD DEVELOPMENT PHASE 19 ,TOMBAK-IRAN ONSHORE FACILITIES
PPI DOCUMENT TITLE: GENERAL ASSEMBLY CONSTRUCTION DRAWINGUNIT 104
DOCUMENT NUMBER: VD-1541-101-DW-0005
NIOC
PARS OIL & GAS COMPANY
PPL/PPI CONSORTIUM
Rev.No : 7
Page Rev-0 Rev-1 Rev-2 Rev-3 Rev-4 Rev-5 Rev-6 Rev-7 Rev-8 Rev-9 Rev-10 Rev-11 1 X X X X X X X X 2 X X X X X X X X 3 X X X X X X X X 4 X X X X X X X 5 X X X X X X X 6 X X X X X X X 7 X X X X X X X 8 X X X X X X 9 X X X X X X X 10 X X X X 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
UNIT 104
This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
GENERAL NOTES
Valves having NACE, Cryogenic and special requirement are listed in below table. Item.No. Tag No. Serial No. Description Compliance documents Valve shall comply with "NACE MR 0175/ISO 15156" and project specifications of "RP-SP19-9996300-003 (SSCC and HIC)" and "RP-SP19-999-6300004"
1041/2/3/4-LV-0017
2707-063-001/002/003/004
NACE
This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.