You are on page 1of 4

NATIONAL IRANIAN OIL COMPANY SOUTH PARS GAS FIELD DEVELOPMENT PHASE 19 ,TOMBAK-IRAN ONSHORE FACILITIES

PPI DOCUMENT TITLE: GENERAL ASSEMBLY CONSTRUCTION DRAWING-UNIT 104

NIOC
PARS OIL & GAS COMPANY

Contract No.:POGC-655-89-35 POI : FA : 7

PPL/PPI CONSORTIUM

DOCUMENT NUMBER: VD-1541-101-DW-0005

Rev. No

NATIONAL IRANIAN OIL COMPANY


SOUTH PARS GAS FIELD DEVELOPMENT PHASE 19 ,TOMBAK-IRAN ONSHORE FACILITIES

DOCUMENT TITLE: GENERAL ASSEMBLY CONSTRUCTION DRAWING-UNIT 104

DOCUMENT NUMBER: VD-1541-101-DW-0005

PURCHASER'S COMMENT/APPROVAL STATUS


1. AP: Approved (Released for Manufacturing)
2. AN: Approved as Noted for Fabrication (Fabrication may Proceed) 3. NF: Approved as Noted for Re-Issue (Fabrication not Proceed)

Purchaser: PETROPARS IRAN (PPI)


Requisition No.:DI-SP19-999-1541-101-00 Item No. (Tag No.): All items Vendor Doc. No.:

4. RE: Rejected 5. NR: Not Returned

Date: Signature: 7 11-Sep-13 6 10-Jul-13 5 4 3 2 1 0 19-Jun-13 28-May-13 26-Apr-13 30-Mar-13 11-Jan-13 01-Jan-13

FOR APPROVAL FOR APPROVAL FOR APPROVAL FOR APPROVAL FOR APPROVAL FOR APPROVAL FOR APPROVAL FOR APPROVAL

Rev

DATE

DESCRIPTION

Kaviyarasan Kaviyarasan Kaviyarasan Kaviyarasan Kaviyarasan Kaviyarasan Kaviyarasan Kaviyarasan PREP'D

Mahil Mahil Mahil Mahil Mahil Mahil Mahil Mahil CHK'D

Karthik Karthik Karthik Karthik Karthik Karthik Karthik Karthik APP'D

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

NATIONAL IRANIAN OIL COMPANY SOUTH PARS GAS FIELD DEVELOPMENT PHASE 19 ,TOMBAK-IRAN ONSHORE FACILITIES
PPI DOCUMENT TITLE: GENERAL ASSEMBLY CONSTRUCTION DRAWINGUNIT 104
DOCUMENT NUMBER: VD-1541-101-DW-0005

NIOC
PARS OIL & GAS COMPANY

Contract No.:POGC-655-89-35 POI : FA

PPL/PPI CONSORTIUM

Rev.No : 7

Page Rev-0 Rev-1 Rev-2 Rev-3 Rev-4 Rev-5 Rev-6 Rev-7 Rev-8 Rev-9 Rev-10 Rev-11 1 X X X X X X X X 2 X X X X X X X X 3 X X X X X X X X 4 X X X X X X X 5 X X X X X X X 6 X X X X X X X 7 X X X X X X X 8 X X X X X X 9 X X X X X X X 10 X X X X 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

SEVERN GLOCON LTD


Olympus Park, Quedgeley, Gloucester, GL2 4NF. United Kingdom
Tel: +44 (0)845 223 2040 Fax: +44 (0)845 223 2041

GENERAL ASSEMBLY CONSTRUCTION DRAWING

UNIT 104

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

SEVERN GLOCON LTD


Olympus Park, Quedgeley, Gloucester, GL2 4NF. United Kingdom
Tel: +44 (0)845 223 2040 Fax: +44 (0)845 223 2041

GENERAL ASSEMBLY CONSTRUCTION DRAWING

GENERAL NOTES
Valves having NACE, Cryogenic and special requirement are listed in below table. Item.No. Tag No. Serial No. Description Compliance documents Valve shall comply with "NACE MR 0175/ISO 15156" and project specifications of "RP-SP19-9996300-003 (SSCC and HIC)" and "RP-SP19-999-6300004"

1041/2/3/4-LV-0017

2707-063-001/002/003/004

NACE

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.