This document outlines a battle plan with project dates numbered 1 through 23 listed down the left side and action items assigned to individuals across the top with a due date listed at the top. It tracks the progress of tasks as "Done!"
This document outlines a battle plan with project dates numbered 1 through 23 listed down the left side and action items assigned to individuals across the top with a due date listed at the top. It tracks the progress of tasks as "Done!"
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online from Scribd
This document outlines a battle plan with project dates numbered 1 through 23 listed down the left side and action items assigned to individuals across the top with a due date listed at the top. It tracks the progress of tasks as "Done!"
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online from Scribd