VICO INDONESIA

JOB SAFETY ANALYSIS.

RIG 453
TASK NO Created REMOVING AND REPLACING SAVER SUB ON TDS / / 199 TASK NO ADQ20 Review Date PAGE 1 OF 1 / / 19..

NO. 1.

STEP TURN ELEVATORS TO DRILL POSITION AND EXTEND TOWARD DRAWWORKS TAKE OUT HINGE PIN ON PIPE HANDLER UNDO SAVER SUB RETAINING RING LIFT PIPE HANDLER ARM WITH WINCH PLACE TONGS ON SAVER SUB AND LOWER BOP AND BREAK PICK UP AND MAKE UP NEW SUB

HAZARD PERSONNEL IN IMMEDIATE VICINITY BEING STRUCK BY ELEVATORS AND BAIL ARMS

CONTROL CLEAR AREA. GOOD OBSERVATION.

2.

FINGERS PINCHED, ITEMS FALLING DOWN WELL BORE. FALLING OFF STEP LADDER

CORRECT TOOLS FOR JOB. COVER HOLE.

3.

PERSON HOLDING LADDER ON STABLE GROUND CLEAR AREA. GOOD OBSERVATION.

4.

PINCH POINTS

5.

TONG ARMS STRIKING TOP DRIVE LINK TILT ARM

POSITION TONGS ACCORDINGLY. WATCH TONG ARMS.

6.

AS ABOVE

AS ABOVE

APPROPRIATE SAFETY CLOTHING AND EQUIPMENT MUST BE WORN AND USED

VICO INDONESIA
JOB SAFETY ANALYSIS.

RIG 453
TASK NO Created NO. 7. REMOVING AND REPLACING SAVER SUB ON TDS / / 199 HAZARD AS ABOVE AS ABOVE TASK NO ADQ20 Review Date CONTROL PAGE 2 OF 1 / / 19..

STEP MAKE UP THEN BREAK AND MAKE UP AGAIN AT 11,500FT/LBS

APPROPRIATE SAFETY CLOTHING AND EQUIPMENT MUST BE WORN AND USED