Professional Documents
Culture Documents
ADQ28-Change Logging Cable Spool
ADQ28-Change Logging Cable Spool
RIG 453
TASK NO Created CHANGE LOGGING CABLE SPOOL / / 1999 TASK NO ADQ28 Review Date PAGE 1 OF 2 / / 19..
NO. 1.
CONTROL CHECK THAT CABLE IS NOT CROSSED BEFORE LIFTING/KEEP HANDS AWAY FROM LAD AREA. GOOD COMMUNICATION WITH CRANE DRIVER. PUT DRUM DOWN ON TIMBERS SO IT CANT ROLL/USE TAG LINES FOR EVERY LIFT. CHECK THAT THE CABLE IS NOT CROSSED UNDER SLINGS/KEEP HANDS AWAY FROM THE LOAD. KEEP HANDS AWAY AS SPOOL IS LOWERED. GOOD COMMUNICATION WITH CRANE DRIVER. CHECK THAT CABLE IS NOT CREASED UNDER SLINGS/KEEP HANDS AWAY FROM LOAD.
2.
3.
SLING LOAD-MONO CABLE DRUM FROM CRADLE. PLACING THE CABLE DRUM ON THE UNIT.
4.
5.
VICO INDONESIA
JOB SAFETY ANALYSIS.
RIG 453
TASK NO Created CHANGE LOGGING CABLE SPOOL / / 1999 TASK NO ADQ28 Review Date PAGE 2 OF 2 / / 19..