a5 7H Responsibility No. Description Bidder_Owner, 1. GENERAL & SITE SERVICE 11 General management & administration at site (1) For Bidder’ s activity ° (2) For Owner’ s activity ° 2) Construction management ° 3} Employment of labors & manpower control ° 4) Construction schedule control (1) project master schedule ° (2) Detall schedule fo} (The detail schedule shall be submitted to Owner for approval 5] Precommissioning schedule (1) The precommissioning schedule shall be submitted to Owner O (2) for approval. ° 6) Quality control at site (1) Bidder shall prepare quality control procedure and submit to Owner. =O (2) for approval fe} 7) Material control (11 Receiving, unloading and inspection for all equipments and ° materials at site, transportation from/to site and sanding shop. (2) Site space for all equipments and materials supplied by Owner ° and Bidder 8] Technical advice for site work Q 9} Safety control at site (1) Safety control > oO (2) Safety devices & equipments for Bidder’ s personnel ° (Helmets, Working clothes, Safety shoes, Gloves, ID card, Safety sign boards and fire extinguishers} 10) Security control at site ° 11) Storage & store keeping for all equipments and materials at site 121 Fire protection at site ° 13) Cleaning in working area ° 14] Medical service at site / first ald ° 15) Maintenance of road for site transportation ° 16) Reports, records and progress (1) Weekly and monthly progress report ° (2) Day to day activity report ° (3) Dally manpower and construction equipment mobilization report ° (4) Dally report for material control fe} (5) Safety report ° (6) Records for construction work including photographs and albums ° (7) Minutes of site meeting ° 1/22 aan Responsibility No. Description Bidder_Owner (8) Progress measurement system to be approved by Owner fo} (9) Others, if required ° 171 Test and inspection (11 Preparation of test and inspection plan for Owner’ s approval oO (2) Preparation of test and inspection report ° All the forms of the report shall be approved by Owner’ s representative. Test/Inspection works shall be performed by Bidder in the presence of Owner’ s representative. 18) Dust control {including Car Washing Facility) ° 19] Waste disposal (1) Metal scrap shall be hauled at the specified location or disposed o (2) None metal debris or waste shall be disposed ° 20) Space for construction facilities fe} (office, Warehouse, Fabrication shop & Storage yard) 21 Construction temporary facilities (1) Site office for Bidder's ° (2) Bidder’s tabor rest facilities QO (3) Pre-fabrication shop and facilities ° (4) Warehouse for owner’ s supply and bidder’ s use and storage yard =O (5) Sanitary facilities (septic tank for Bidder’ s use) fe} (6) Sanding & painting shop and facilities ° 22) Temporary fence and gate ° 23) Canteen ©. 24) Temporary electricity for construction (1) Design, equipment supply, installation and maintenance for power ° receiving & power distribution facilities for S00KVA 251 Temporary water for construction (1) Installation of pipeline ° (2) Approval for use of temporary water fo} (31 Payment of charge for use of temporary water °o 26) Removal of all temporary facilities oO 27) Arrangement of gate pass and vehicle pass for Bidder’s personnel and vehi 28) Arrangement of work permits oO ° 29] Marked drawing for As~built oO 30) Coordination with other partiestif any) oO 31) All taxes, duties and charges in connection with the Bidder's works ° 32) Insurance (Amuse ° (2) Workmen's compensation insurance (21H%2!) ° (3) Third party lability insurance ° 2/22 S389 Responsibility No. Description Bidder_Owner (4) Erection all risks insurance ° (5) Others for Bidder’ s works and materials ° (6) SSO 27H Ser ° 33) Preparation of turnover procedure ° 3/22

You might also like