You are on page 1of 1

Hydrotest-27/08/2013- two leakages in water wall: (1) attachment of buskstay with front ash panel the middle one.

(2) Burner panel acetylene cutting of right side top one. Hydrotest : 25/08/2013- 11 leakages are encountered , 7 in roof and four in eco hanger. Hydrotest : 1st time -34 leakages were found,18 in roof,7 in right side water wall , 5 in LTSH and four in lower economiser inlet header tube joints.

You might also like