Professional Documents
Culture Documents
Enviroment Officer
QA Manager
QC Manager
Purchasing Manager
Finance Manager
Accounting Manager
IT Manager
Logistic Manager
90
Administrasi UHT
Koordinator Engineering
Koordinator Packing
Supervisor Engineering
Supervisor Packaging
Foreman Engineering
Foreman Packaging
Operator Mixing
Operator Pasteurisasi
Operator Sterilisasi
Teknisi
Operator Filling
Operator Packaging
Crew Sortir
Crew Dumper
91
1. Air
3. Cocoa slurry
2. Stabilizer (55-60oC)
PHE Filter
Russle filter Balance tank Homogenisasi Pasteurisasi Regenerative Heating Regenerative Cooling
Yes
No
FDV
Buffer tank 92
Laktosa-TCP steril
Flash cooling
IMP
Crystallization tank
Filter Alumunium foil Mesin Piltz Sterilisasi UV Closer Coding Labelling N2 Pembelahan Alufo Vertical sealing (1651oC) Horizontal sealing (163oC) Filling Coding Autocase packer Perforasi dan cutting
Filler bowl
No Check weigher Yes Palleting Reproses Check weigher Yes Flapping/ Pelipatan Plastik Wrapping Packaging
No
Reproses
93
Check
No
94
Gambar 6. Liquiverter
95
96
97
98
Gambar 9. Produk yang Sudah Dikemas Tetra Pak yang Keluar dari Mesin Filling melalui Konveyor
99
100
101
Fresh Milk
Pendinginan 8oC)
(4-
Mixing (55-60oC)
Balance Tank
Balance Tank
FDV
YA
FDV
Pendinginan (48oC)
YA
Pasteurisasi Tank
Balance Tank
Homogenisasi (7075oC, P1=200 bar, P2=50 bar) Sterilisasi (Choco=144-145oC; Non Choco=141143oC, 4 detik, Plain = 140oC)
FDV
YA
TIDAK
Unsteril
Pendinginan (2030oC)
Aseptic Tank
Filling
Packaging
102
Coding
L
1000 ml Tetra Paper Pull Tab Punching
Longitudinal Sealing
Inner Stripping
Aseptic Filling
Alufo Application
Strip Applicator
Transversal Sealing
H2O2
Chemical Sterilization
Pack Forming
Squeezing
No Reproses
Hot Air Purging
103
PHE
Flex Mix
Almix
PHE
Liquiv erter
Sugar
SMP
Tangga
Choco Slurry Tank Choco Slurry Tank
R. Formu lasi
PHE
Sensor
Mixing Tank
Area Mixing
R. Teknisi Engineering
PHE
Mixing Tank
Control Panel
Tangga
Office UHT
Area Loker
Holding Tube
Holding Tube
Homo
K or osi f
Holding Tube
Homo
Balance Tank
Balance Tank
Balance Tank
Balan ce Tank
PHE
Homo
Homo
Control Panel
Musholla
CIP
PHE
PHE
Homo
K or osi f
Sirculation CIP
Control Panel
Holding Tube
PHE
Balan ce Tank
Acid
Lye
Hot Wate r
Flash Wate r
CIP
AT 1
AT 2
AT 3
Hidration Tank
210.100
Recovery Tank 1
Operator Filling
Area Filling
Control Panel
Hidration Tank
PHE Past.
Sirculation
Control Panel
CIP
Hidration Tank
208.100
209.100
Recovery Tank 2
Area Packing
FM Tank 114.100
Balance Tank FM
Control Panel
PHE FM
PHE
104