You are on page 1of 9

Mc Donalds ...

Limassol

Hot water boiler with 6 electric elements. After 3 months using UNIPOLMAG TDS:600ppm, TH:25D

Mc Donalds ... Limassol

Lime has been discalced from sides an electric elements. According to McDonalds franchiser before UNIPOLMAG installation 3 lower elements had to be replaced average every 40 days due to scaling

Hot Water Boiler System (inside)

Residential Hot Water Boiler after 4 years of operation with UNIPOLMAG. Please note no lime what so ever TDS:450ppm & TH:18D

APHRODITE HILLS GOLF CLUB Hot Water Boilers

Boiler tubes (elements ) with lime operating for 15 months TDS:600ppm, TH:25D

APHRODITE HILLS GOLF CLUB Hot Water Boilers

After 3 months operation with UNIPOLMAG Tubes discalced, photo on the left All lime from sides & tubes, photo on the right 40% energy saving after lime removal T.H.: 25D

INTERCONTINENTAL HOTEL - Water Fall

Photo on the left: without UNIPOLMAG Photo on the right: after 3 months with UNIPOLMAG

Titan Cement Factory - Heat Exchangers

Application on two heat exchangers. One of them after 6 months operation without UNIPOLMAG, photo on the right Photo on the left after 6 months operation with UNIPOLMAG T.H.: 24 -27 D

Psyttalia Sewage plant

Left photo: Struvite blocking the 30cm diameter pipe. Mechanical Cleaning every 3-4 months before UNIPOLMAG Right photo: Same pipe after 6 months with UNIPOLMAG that discalced the existing struvite. Plant operating for 12 months tube free

COLUMBIA Nursery Plant

Photo on the left: Plants before UNIPOLMAG installation Photo on the right: After 3 months using UNIPOLMAG for irrigation TDS: 1520S/cm, T.H.: 708mg/l