1. BEAMS RUNNING NORTH-SOUTH VIEWED LOOKING TO THE WEST. BEAMS RUNNING EAST-WEST VIEWED LOOKING TO THE NORTH. 2.

BEAM DIMENSIONS GIVEN ARE OVERALL DEPTH x WIDTH. 3. BEAM BARS AT SLAB LEVEL MAY BE SPREAD INTO THE SLAB IF NECESSARY AT 40mm MIN. CLEAR SPACING IF APPROVED BY THE ENGINEER. 4. PROVIDE Y12-200 OR Y16-300 EACH FACE CONTINUOUS (500 LAP, SIDE FACE REINFORCEMENT) FOR BEAMS GREATER THAN 750mm DEEP UNLESS NOTED OTHERWISE. 5. (P) DENOTES PRIMARY BEAMS. 6. (S) DENOTES SECONDARY BEAMS. 7. (a)PRIMARY BEAM REINFORCEMENT TO BE LAID: TOP BARS IN UPPER LAYER | REFER STD NOTES BOTTOM BARS IN LOWER LAYER | FOR COVER (b)SECONDARY BEAM REINFORCEMENT TO BE LAID : TOP BARS IN LOWER LAYER | REFER STD NOTES BOTTOM BARS IN UPPER LAYER | FOR COVER - PLACE TOP SECONDARY BARS IN UPPER LAYER WHEN NO INTERFERENCE OCCURS WITH PRIMARY BEAM REINFORCEMENT. - WHERE BOTTOM BARS IN SECONDARY BEAMS CLASH WITH BOTTOM BARS IN PRIMARY BEAMS (BEAMS OF THE SAME DEPTH),CRANK SECONDARY REINFORCEMENT AS SHOWN ON SCHEDULE. 8. THIS DRAWING TO BE READ IN CONJUNCTION WITH STANDARD DETAIL SD.. AND STANDARD NOTES ON DRAWING S... 9. <D> - DENOTES DURABLE CONCRETE - REFER STANDARD NOTES ON DRAWING No. S..

You might also like