Project: Location: Contract: Engineer: Filename:

S.E.P. CENTRAL AZUCARERO TRUJ. MOTATAN

ETAP
6.0.0

Page: Date: SN:

1 07-11-2012 12345678 Base Normal

Study Case: SM CENTRAL_MOTATAN

Revision: Config.:

Adjustments
Apply Tolerance Transformer Impedance: Reactor Impedance: Overload Heater Resistance: Transmission Line Length: Cable Length: Adjustments
Yes Yes No No No

Individual /Global
Individual Individual

Percent

Apply Temperature Correction Transmission Line Resistance: Cable Resistance: Adjustments


Yes Yes

Individual /Global
Individual Individual

Degree C