SEQUENCE OF OPERATION FOR SLOPE CUTTING WORKS AT THE UTILITY CORRIDOR

PREPARATION WORKS

CONSTRUCTION OF HARDCORE ACCESS FOR TIPPER TRUCKS AND LORRY CRANE

PLACING STEEL PLATES

CUTTING OF TREES AND CLEARANCE OF VEGETATION

SETTING UP OF ECM AND HOLDING TANKS

CONSTRUCTION OF DRAINAGE/ SUMPS

ECM OPERATIONIONAL

MARK CLEARING WIDTH (SETTING OUT)

START EXCAVATION WORKS AT CHAINAGE 1

TOP SOIL REMOVAL

FORMATION OF SLOPE

HAULAGE