A new method for blasting pattern design, based on reform of KUZRAM fragmentation model, in Gol-e-Gohar iron mine
ABSTRACT
The purpose of blasting in mines is rock mass fragmentation and production a harvest in optimum
size. Therefore, in all of designs, the main purpose have to be preservation optimum size and the second
purpose, control of undesirable results up to allowable limit. In this study, for design of blasting optimum
pattern in Gol-e-Gohar iron mine, on the basis of the blasting done in Gol-e-gohar mine, adverted to
fragmentation size and by fragmentation size Determination in this mine, KUZ-RAM model was
Modified. the dimensions of fragmented rocks was calculated with image analysis method and by using
GoldSize software and for reform of KUZ-RAM fragmentation model, used linear regression. This
Modified model is a Criterion for blasting pattern design. By reform of model and Determination of
fragmentation Average size, can Calculate the powder factor and burden. By using this method, powder
factor Equal to 0.91 kg/m3 , burden Equal to 5.5 m and spacing Equal to 6.9 m Determined.
Keywords: KUZ-RAM model, optimum burden, blasting pattern, Gol-e-Gohar iron mine
bagheri_maysam@yahoo.com - -1
khoshrou@aut.ac.ir -2
Ataei@shahroodut.ac.ir -3
-4
433
( 51 51 )5935
-1
.
.
.
.
: .
.
.
.
.
.
.
- .
. .
- ( )
.
. .
Gold size .
-2 -
.
.
-1-2 -
- 1983 ( )Cunningham 1987
. ( )Kuznetsov
- ( )Rosin & Rammler] .[1 -
433
( 51 51 )5935
. - :
0.633
()1
115
X Fr q 0.8 Q 0.167
()2
BI 1986 ( )Lilly
:
()3
:RMD :JPS :JPO :RDI
:HF .
)1( BI ].[1
-2-2 -
-
] .[1
- - (
) ] .[2 ( )1
- ( )Gold size . -
. -
. .
433
( 51 51 )5935
(RMD)
10
20
50
)(JPS
0/1
10
0/1 1
20
50
)(JPO
10
20
30
40
(RDI)
25 -50
: ( )
)(HF
50
)(GPa
50
(MPa)
Gold size
10
()cm
45
40
35
30
25
20
15
10
5
0
1
( :)1 -
( )Gold size
- .
10 -
-
( ( .))2 - ( )x
)y( - (.)4
)2( - .
433
( 51 51 )5935
.
-
. . ( )2
. .
0/68 - ( )
. .
.
( :)2 -
5/5 * 6/5
5/5 * 7
0/91
5/5 * 6/5
0/98
10/9
5/5 * 6/5
0/98
8/5
5/5 * 6/5
0/98
9/1
21
5/5 * 7
0/91
10/9
48
5/5 * 7
0/91
10/3
44
34/4
5/5 * 7
0/91
9/7
27
32/4
5*6
1/17
10/3
33
28/2
10
5*6
1/17
8/5
21
23/3
()Gold size
( -)
)(kg/m3
)(Fr
)(cm
)(cm
0/98
7/9
31
30/5
9/1
26
30/4
48
34/3
26
26/7
28/6
36/4
50
y = 1/56x -17/3
R2 = 0/68
30
20
(cm ) G old size -
40
10
38
36
34
32
28
30
26
24
22
) (cm
-
- :
()4
0.633
115
17.3
X 1.56 Fr q 0.8 Q .167
433
( 51 51 )5935
-3
( ))4( )5( :
()5
0.79
115
X 17.31.25
.
:
) ) : ( X
.
, .
.
1
40 .
40 " " .
20 20
] .[2 20 40 .
30 40
.
)5( 35 .
) ):(Fr
)2( .
10.
) ):(Q
. .
.
.
1
]:[3
12Z Q.E 3
TS
Fr 100
()6
433
( 51 51 )5935
6( 14 ; :Q )10 8
8 :E (kg)
( )100;.
0/251
5/3 . 17/5 12/2
513 .
) ):(E
100 .
( )) 5(
0/91 kg/m3 . ( )1 kg/m3 .
.
0/91 kg/m3 .
.
.
:
()7
D e .h c
1
h
2
H.q
D e .h c
1
h
2
1.25H.q
S
1/25 1.25
B
) ( . )8(
5/5 6/9 .
5*6 5/5*6/5 .
( )5/5*6/9 ( )5/5*6/5
0/4 . .
433
( 51 51 )5935
-4
. - ( )
( ) 35 cm
. )0/91 kg/m3(
. 5/5 m
6/9 m .
10 Gold
size . 32 cm
.
( )B*S .
-5
[1] - Ataei, M., Ziari, N., Investigation of fragmentation distribution of Sangan iron ore mine due to blasting, The Second Iranian
Open Pit Mines Conference, Kerman, Iran, pp. 169-177, 2005.