At present, Shikarpur 220 kV Substation is being fed through 500/220 kV substation at Guddu through Guddu - Shikarpur 220 kV S/C transmission line on one side and U hShikarpur 220 kV S/C transmission on the other side! At Guddu, the e"isting #"$50 %VA, 500/220 kV transformers are suffi ient to transfer po&er from the e"isting po&er plants of Guddu and U h to 500 kV s'stem! (o&e)er, as per the latest generation e"pansion plan, additional $50 %* po&er plant +U h2, has been planned at the same site of e"isting 500 %* U h po&er plant and also some other thermal po&er plants, i!e! -au.i %ari +/aharki, 202 %*, and 0ngro Chemi al 221 %* ha)e also been proposed in the )i init' of Guddu! 2n these ir umstan es, the e"isting #"$50 %VA, 500/220 kV transformers at Guddu &ould not be suffi ient to transfer po&er from these in oming po&er plants to the 500 kV transmission s'stem espe iall' during 3ff-peak load onditions of 4anuar' &hen thermal generation is high and load demand of the s'stem is lo&! 5herefore, a the upgradation of the e"isting 220 kV Shikarpur 6e& to 500 kV &ith 2"700 %VA, 500/220 kV transformers in the )i init' of Guddu po&er station has been proposed for reliable dispersal of po&er from the in oming thermal generation around Shikarpur to the 500 kV transmission s'stem!
ork!
8 Upgradation of Shikarpur 6e& 220 kV grid station to 500 kV &ith 2"700%VA, 500/220 kV transformers! 8 5&o 500 kV S/C transmission lines +appro"! 20920: $0 km long on # bundled Greele' ondu tor, for looping in ; out of /adu - Guddu 500 kV S/C transmission line at Shikarpur 6e& 500 kV substation! 8 5&o 500 kV S/C transmission lines +appro"! 22922 : $$ km long on <uad-bundled Greele' ondu tor, for looping in ; out of /adu - Guddu 500 kV S/C transmission line at Shikarpur 6e& 500 kV substation 8 A 220 kV //C transmission line, appro" 50 km long on single =ail ondu tor for looping in ; out of U h - Guddu 220 kV S/C transmission line at Shikarpur 6e& 220 kV substation!
>2- >
12."
substation at Shikarpur under )arious operating s enarios in the months of Aug!/Sept! during summer season +&hen s'stem demand in reases, and in the month of 4anuar' &hen dispat h of thermal po&er plants lo ated in south are high! 5he assumptions for the load flo& studies are as under@8 8 8 8 ?atest load fore ast ?atest generation and transmission e"pansion plans All transmission s'stem operated in an inter onne ted manner All the e"isting publi po&er plants/2AAs feeding (0SC3 ha)e been assumed in operation in all the stud' s enarios! Similarl', the proposed thermal 2AAs in south, i!e! /aharki +%ari,, 0ngro Chemi al and Green Ao&er as &ell as Ca)alier 0nerg' and Arogas 0nerg' ha)e been assumed in the studies as per their ommissioning s hedule! 8 5he dispat hers from the thermal plants espe iall' ha)e been kept as per their ma"imum generation apa ities during &inter and summer seasons! 5he results of the load flo& studies are des ribed as under@ 12.#
?oad flo& stud' for Aeak load in 4anuar' 20>2 under normal s'stem ondition &ithout the proposed s ope of Shikarpur 6e& 500 kV substation is atta hed as 0"hibit B>! 2n this ase, the #"$50 %VA, 500/220 kV transformers at Guddu &ould be loaded to C5 D of their rated apa ities! 5he load flo& stud' has also been arried out for Aeak load 4anuar' 20>2 &ith the proposed s ope of Shikarpur 6e& 500 kV substation and the stud' under normal s'stem ondition is atta hed as 0"hibit B2! 5he stud' depi ts that &ith the ommissioning of Shikarpur 6e& 500 kV substation, the loading of 500/220 kV transformers at Guddu &ould redu e signifi antl', i!e!, 7ED of their rated apa ities &hile 2"700 %VA, 500/220 kV transformer at Shikarpur 6e& &ould be loaded to 2CD of rated apa ities under normal s'stem onditions! 2n general, the stud' results depi t that after the ommissioning of Shikarpur 500 kV substation, the s'stem operates &ell &ithin limits, i!e!, the loading of the transmission lines and transformers as &ell as s'stem )oltage profile &ould remain &ithin limits!
>2- 2
5he results of the load flo& studies for riti al as under@ %&hibit' " (ontin)ency (ondition Shikarpur 6e& - Guddu 500kV S/C 3ut
Ao&er flo&s on the other transmission lines and transformers as &ell as the )oltage profile of the s'stem remain &ithin limits Ao&er flo&s on the other transmission lines and transformers as &ell as the )oltage profile of the s'stem remain &ithin limits
>2- #
%&hibit 3
*e+arks
Ao&er flo&s on the other transmission lines and transformers as &ell as the )oltage profile of the s'stem remain &ithin limits
>2- $
>2- 5
12..
(onclusions!
>! 5he upgradation of 220 kV Shikarpur 6e& to 500 kV is re<uired for reliable dispersal of po&er from the in oming thermal generation around Shikarpur to the 500kV transmission s'stem! 2! 5he benefits asso iated &ith the indu tion of the proposed Shikarpur 500kV substation mainl' in lude@ +a, +a, +b, =edu tion in the loading of 500/220 kV transformers at Guddu po&er house! =edu tion in transmission line losses! 2mpro)ement in o)erall s'stem reliabilit' of 65/C neteork &!r!t! e"port of southern generation to the northern load enters!
>2- 7
Sr. No. 1
7escription Appointment of onsultants, $ design, dra&ing and preparation of bidding do uments Hidding 5 S 0
2010111
2011112
201211"
N 7 $
/ 5 / $
S 0 N
7 $
/ 5 / $
5 S
0 N
7 $
F / 5 / $
"
Ci)il &orks
8
i
>2- 1
5esting ; ommissioning
88