CONSTRUCTION OF 500 KV GRID STATION AND ALLIED TRANSMISSION LINE AT SHIKARPUR

Load Flow studies

CHAPTER 12 Load Flow Study


12.1 Load Flow Study for 500 kV Shikarpur New Substation

At present, Shikarpur 220 kV Substation is being fed through 500/220 kV substation at Guddu through Guddu - Shikarpur 220 kV S/C transmission line on one side and U hShikarpur 220 kV S/C transmission on the other side! At Guddu, the e"isting #"$50 %VA, 500/220 kV transformers are suffi ient to transfer po&er from the e"isting po&er plants of Guddu and U h to 500 kV s'stem! (o&e)er, as per the latest generation e"pansion plan, additional $50 %* po&er plant +U h2, has been planned at the same site of e"isting 500 %* U h po&er plant and also some other thermal po&er plants, i!e! -au.i %ari +/aharki, 202 %*, and 0ngro Chemi al 221 %* ha)e also been proposed in the )i init' of Guddu! 2n these ir umstan es, the e"isting #"$50 %VA, 500/220 kV transformers at Guddu &ould not be suffi ient to transfer po&er from these in oming po&er plants to the 500 kV transmission s'stem espe iall' during 3ff-peak load onditions of 4anuar' &hen thermal generation is high and load demand of the s'stem is lo&! 5herefore, a the upgradation of the e"isting 220 kV Shikarpur 6e& to 500 kV &ith 2"700 %VA, 500/220 kV transformers in the )i init' of Guddu po&er station has been proposed for reliable dispersal of po&er from the in oming thermal generation around Shikarpur to the 500 kV transmission s'stem!

12.2 Proposed Scope of

ork!

8 Upgradation of Shikarpur 6e& 220 kV grid station to 500 kV &ith 2"700%VA, 500/220 kV transformers! 8 5&o 500 kV S/C transmission lines +appro"! 20920: $0 km long on # bundled Greele' ondu tor, for looping in ; out of /adu - Guddu 500 kV S/C transmission line at Shikarpur 6e& 500 kV substation! 8 5&o 500 kV S/C transmission lines +appro"! 22922 : $$ km long on <uad-bundled Greele' ondu tor, for looping in ; out of /adu - Guddu 500 kV S/C transmission line at Shikarpur 6e& 500 kV substation 8 A 220 kV //C transmission line, appro" 50 km long on single =ail ondu tor for looping in ; out of U h - Guddu 220 kV S/C transmission line at Shikarpur 6e& 220 kV substation!

>2- >

CONSTRUCTION OF 500 KV GRID STATION AND ALLIED TRANSMISSION LINE AT SHIKARPUR

Load Flow studies

12."

Load Flow Studies


arried out to en)isage the re<uirement of ne& 500 kV

?oad flo& studies ha)e been

substation at Shikarpur under )arious operating s enarios in the months of Aug!/Sept! during summer season +&hen s'stem demand in reases, and in the month of 4anuar' &hen dispat h of thermal po&er plants lo ated in south are high! 5he assumptions for the load flo& studies are as under@8 8 8 8 ?atest load fore ast ?atest generation and transmission e"pansion plans All transmission s'stem operated in an inter onne ted manner All the e"isting publi po&er plants/2AAs feeding (0SC3 ha)e been assumed in operation in all the stud' s enarios! Similarl', the proposed thermal 2AAs in south, i!e! /aharki +%ari,, 0ngro Chemi al and Green Ao&er as &ell as Ca)alier 0nerg' and Arogas 0nerg' ha)e been assumed in the studies as per their ommissioning s hedule! 8 5he dispat hers from the thermal plants espe iall' ha)e been kept as per their ma"imum generation apa ities during &inter and summer seasons! 5he results of the load flo& studies are des ribed as under@ 12.#

Peak Load $anuary 2012

?oad flo& stud' for Aeak load in 4anuar' 20>2 under normal s'stem ondition &ithout the proposed s ope of Shikarpur 6e& 500 kV substation is atta hed as 0"hibit B>! 2n this ase, the #"$50 %VA, 500/220 kV transformers at Guddu &ould be loaded to C5 D of their rated apa ities! 5he load flo& stud' has also been arried out for Aeak load 4anuar' 20>2 &ith the proposed s ope of Shikarpur 6e& 500 kV substation and the stud' under normal s'stem ondition is atta hed as 0"hibit B2! 5he stud' depi ts that &ith the ommissioning of Shikarpur 6e& 500 kV substation, the loading of 500/220 kV transformers at Guddu &ould redu e signifi antl', i!e!, 7ED of their rated apa ities &hile 2"700 %VA, 500/220 kV transformer at Shikarpur 6e& &ould be loaded to 2CD of rated apa ities under normal s'stem onditions! 2n general, the stud' results depi t that after the ommissioning of Shikarpur 500 kV substation, the s'stem operates &ell &ithin limits, i!e!, the loading of the transmission lines and transformers as &ell as s'stem )oltage profile &ould remain &ithin limits!

>2- 2

CONSTRUCTION OF 500 KV GRID STATION AND ALLIED TRANSMISSION LINE AT SHIKARPUR

Load Flow studies

5he results of the load flo& studies for riti al as under@ %&hibit' " (ontin)ency (ondition Shikarpur 6e& - Guddu 500kV S/C 3ut

ontingen ' onditions are summariFed *e+arks

Ao&er flo&s on the other transmission lines and transformers as &ell as the )oltage profile of the s'stem remain &ithin limits Ao&er flo&s on the other transmission lines and transformers as &ell as the )oltage profile of the s'stem remain &ithin limits

Shikarpur 6e& - /adu 500kV S/C 3ut

*eduction in ,rans+ission Syste+ Losses - ... /

12.5 0ff1Peak Load $anuary 2012


?oad flo& stud' for 3ff-peak load in 4anuar' 20>2 under normal s'stem ondition &ithout the proposed s ope of Shikarpur 6e& 500 kV substation is atta hed as 0"hibit B5! 2n this ase, the #"$50 %VA, 500/220 kV transformers at Guddu &ould be o)erloaded +loading being >01D of their rated apa ities,! 5he load flo& stud' has also been arried out for off-peak load 4anuar' 20>2 &ith the proposed s ope of Shikarpur 6e& 500 kV substation and the stud' under normal s'stem onditions is atta hed as 0"hibit B7! 5he stud' depi ts that &ith the ommissioning of Shikarpur 500 kV substation, the loading of 500/220 kV transformers at Guddu &ould redu e to C#D of their rated apa ities &hile the 2"700%VAG 500/220 kV transformers at Shikarpur 6e& &ould be loaded to $>D of rated apa ities under normal s'stem onditions! 2n general, the stud' results depi t that after the ommissioning of Shikarpur 6e& 500 kV substation, the s'stem operates &ell &ithin limits, i!e! the loading of the transmission lines and transformers as &ell as s'stem )oltage profile &ould remain &ithin limits! 5he results of the load flo& studies of riti al ontingen ' onditions are summariFed as under@ %&hibit' . (ontin)ency (ondition Shikarpur 6e& - Guddu 500kV S/C 3ut *e+arks Ao&er flo&s on the other transmission lines and transformers as &ell as the )oltage profile of the s'stem remain

>2- #

CONSTRUCTION OF 500 KV GRID STATION AND ALLIED TRANSMISSION LINE AT SHIKARPUR

Load Flow studies

%&hibit 3

(ontin)ency (ondition &ithin limits

*e+arks

Shikarpur 6e& - /adu 500kV S/C 3ut

Ao&er flo&s on the other transmission lines and transformers as &ell as the )oltage profile of the s'stem remain &ithin limits

*eduction in ,rans+ission Syste+ Losses - 2.# /

>2- $

CONSTRUCTION OF 500 KV GRID STATION AND ALLIED TRANSMISSION LINE AT SHIKARPUR

Load Flow studies

12.4 Peak Load 5u).6Sept. 2012


?oad flo& stud' for peak load in Aug!/Sept! 20>2 under normal s'stem ondition &ith the proposed s ope of Shikarpur 6e& 500 kV substation is atta hed as 0"hibit BE! 5he stud' depi ts that &ith the ommissioning of Shikarpur 6e& 500 kV substation, the loading of 500/220 kV transformers at Guddu &ould be $2D of their rated apa ities &hile 2 " 700 %VA, 500/220 kV transformer at Shikarpur &ould be loaded to 2$D of rated apa ities under normal s'stem onditions! 2n general, the stud' results depi t that after the ommissioning of Shikarpur 500 kV substation, the s'stem operates &ell &ithin limits, i!e! the loading of the transmission lines and transformers as &ell as s'stem )oltage profile &ould remain &ithin limits! 5he results of the load flo& studies of riti al ontingen ' onditions are summariFed as under@ %&hibit 3 (ontin)ency (ondition 10 Shikarpur 6e&-Guddu 500kV S/C 3ut Ao&er flo&s on the other transmission lines and transformers as &ell as the )oltage profile of the s'stem remain &ithin limits 11 Shikarpur 6e& - /adu 500kV S/C 3ut Ao&er flo&s on the other transmission lines and transformers as &ell as the )oltage profile of the s'stem remain &ithin limits *e+arks

*eduction in ,rans+ission Syste+ Losses - #.2 /

>2- 5

CONSTRUCTION OF 500 KV GRID STATION AND ALLIED TRANSMISSION LINE AT SHIKARPUR

Load Flow studies

12..

(onclusions!

>! 5he upgradation of 220 kV Shikarpur 6e& to 500 kV is re<uired for reliable dispersal of po&er from the in oming thermal generation around Shikarpur to the 500kV transmission s'stem! 2! 5he benefits asso iated &ith the indu tion of the proposed Shikarpur 500kV substation mainl' in lude@ +a, +a, +b, =edu tion in the loading of 500/220 kV transformers at Guddu po&er house! =edu tion in transmission line losses! 2mpro)ement in o)erall s'stem reliabilit' of 65/C neteork &!r!t! e"port of southern generation to the northern load enters!

>2- 7

Sr. No. 1

7escription Appointment of onsultants, $ design, dra&ing and preparation of bidding do uments Hidding 5 S 0

2010111

2011112

201211"

N 7 $

/ 5 / $

S 0 N

7 $

/ 5 / $

5 S

0 N

7 $

F / 5 / $

"

0)aluation ; a&ard of ontra t

Ci)il &orks

8
i

>2- 1

%anufa turing and shipment of e<uipment,

2nstallation ; 0re tion

5esting ; ommissioning

88