You are on page 1of 1

NORTHERN PACIFIC RAILROAD

Centered between Brainard, Minnesota, and its terminus in Portland Oregon, Livingston became the hub of the NPRR in 1883. To navigate the Bozeman pass, the NPRR designed a switchback and used helper engines stored in Livingston to help with this steep ascent over the pass.

You might also like