120hp-50brass/hr work done= 141.5cmt/hr bucket capacity-0.

75cmt one hour fuel - 12litre maintenance - 1,25000 driver - 12000/month including 60hp-30brass bucket capacity=.5cmt fuel-7litre/hr maintenance=32-33k operator wage=8000/month including food,allowance Selection of equipment b) Excavator with bucket Komatsu PC 400 productivity m3/per day considered. Option -2 - Cost working for PC 400: 1. Hire charges per Hour Rs.1200.00 rate for 10 hrs = 12,000 2. Cost of Diesel 10 litres per hour @ 70 Rs per litre considered for 10 hrs = 7 ,000 3. Operator wages included 4. Operator food, accommodation & transport per day =Rs.300 5. Wages for Banks man Rs.400 TOTAL COST PER DAY = RS.19,700 X 2.5 (2 + 1 Excavator 10 days) Excavators requir ed = Rs.49,250 per day and total cost estimated for 45 days is 49,250 x 45 =Rs.2 2.16 lacs 1brass=100cft 1cmt=35.28cft EOQ economic order calculation .As we are procuring Bitumen from Indian Oil Corp. Bangaigaon, Assam, how manywo uld we order at a time? If we order a large quantity each time we order, we ll end u pholding some bitumen in inventory for a longer time & than if we had ordered a smaller quantity. With a higher quantity, inventory cost goes high.If we order a small quantity, we ll end up paying any setup and/or fixed costs morefrequently. For example, the driver of the truck delivering the bitumen is paid the same,whe ther the truck is loaded with 10MT bitumen or 2MT bitumen. If we order only 2MT Receiving and issuing of inventories are the common and recurring phenomena in a manufacturing organization. When the inventories fall below a particular level, they arereplenished by the fresh purchases. The prescription of re-order level ( ROL) is animportant technique of inventory control. It fundamentally deals with w hen to order toreplenish the inventories. Re-order level is predetermined point, and when the existingstock of inventories reaches this point of falls below it, the purchase action is initiated toreplenish them. The ROL is mentioned in the b in-card of each inventory item. Whatshould be the quantity of replenishment orde r is also a matter of policy. Generally, size ofthe order is determined on the b asis of the economic ordering quantity(EOQ) which is also an important technique of inventory control. detailed treatment is given to this technique seperately. 800

You might also like