DESIGN CRITERIA
Materials Fc = 20.7 MPa Fy = 275 MPa (for bars with diameter smaller than 16mm) = 414 MPa (for bars with diameter greater or equal to 16mm)
Loading Analysis
Dead Load
Live Load
Dead Load Long Span G.I Sheet..100 Pa Ceiling (Suspended Metal Lath and Gypsum Plaster)..480 Pa
Electromechanical50 Pa Bracing System..70 Pa Insulation (Polystyrene Foam, 50mm).20 Pa Weight of Purlins (LC 90x 45x 15x 2.0).29.82 N/m
P a g e | 22
Weight of Truss (WT) WT = 35.83 + 11.78 L = 35.83 + 11.78 (10) WT = 153.63 KN/m
C1 = 3m C2 = 5m C3 = 4.5m C4 = 2.5m
a=1m b = 1.08m
P 1 = WT x a x c = 153.63 x 1 x 5 = 768.15 P2 = (100 + 70 + 20) x a x c = (100 + 70 + 20) x 1 x 5 = 950 P3 = = = 35.43 PT = P1 + P2 + P3 = 768.15 + 950 + 35.43 PT = 1753. 58 N = 876.8 N R1 = R2 =23077.91 N or 23 KN R1 = R2 = xb x1.08 F = (480 + 50) x b x c = 530 x 1.08 x 5 F = 2862 N = 1431 N
P a g e | 23
Live Load T.A (Tributary Area) = 1.08 x 5 =5.4 < 20 Slope = 40% Therefore, live load = 750 Pa P = 750 x 5.4 P = 4050 N = 2025 N
P a g e | 24
Loads
Dead Load Floor Finishing: Ceramic Tiles...0.77 KPa Laminated Ipe or Narra Wood Blocks (76mm) on 13mm mortar.0.77 KPa Ceiling (Suspended Metal Lath and Gypsum Plaster)..0.48 KPa Electromechanical..0.50 KPa Interior Partitions.1.0 KPa Partitions 150mm Hollow Concrete Masonry w/ full hollow grout spacing plastered on both sides (19.6 KN/m3).3.30 KPa 100mm Hollow Concrete Masonry w/ full hollow grout spacing plastered on both sides (19.6 KN/m3).3.17 KPa Railings0.50 KPa hmin = hmin = * * + +
hmin =0.1239 say 0.130 or 130 mm Weight of Slab W = 24 x 0.130 = 3.12 KPa
P a g e | 25
L side 4 4 5 4
S side 3 4 4 2
Slab Type Two Way Slab Two Way Slab Two Way Slab One Way Slab
Slab (S-1) Total Dead Load = 5.05 KPa; Total Live Load = 1.9 KPa L side W= *
2
L side Live load= 1.9 x 4= 7.6 KN/m WLL = 7.6 KN/m S side Live load= 1.9 x 3= 5.7 KN/m WLL = 5.7 KN/m
W=
32 4
3.12 KPa (self- weight of slab) x3 = 9.36 KN/m WDL= 11.04 KN/m
Slab (S-2) Total Dead Load = 5.05 KPa; Total Live Load = 1.9 KPa
W=
W=
W = 1.68 KN/m 3.12 KPa (self- weight of slab) x3 = 9.36 KN/m WDL= 11.04 KN/m P a g e | 26
Slab (S-3) Total Dead Load = 6.55 KPa; Total Live Load = 1.9 KPa L side W= * W=
2
42 5
Slab (S-4) Total Dead Load = 4.92 KPa; Total Live Load = 1.9 KPa L side W= W=
= 2.46 KN/m
3.12 KPa (selfweight of slab) x 4 = 12.48KN/m WDL=14.94 KN/m
P a g e | 27
P a g e | 28
P a g e | 29
P a g e | 30
P a g e | 31
P a g e | 32
P a g e | 33
P a g e | 34
P a g e | 35
P a g e | 36
P a g e | 37
P a g e | 38
P a g e | 39
P a g e | 40
P a g e | 41
P a g e | 42
b = =
b =0.021 RU = MU = =
2
= RU = 5.86 MPa
MU =95 KNm =
= =0.0007
1 1
P a g e | 43
min = =
min = 0.0034
w=
= w = 0.32
MUMAX = fc wb
Therefore, compression steel is needed, design as double reinforced. ASMAX = MAXbd = 0.016 (200) (300) AS = 960 MU1 = MUMAX MU1 = 87 KNm MU2 = MU - MUMAX = 95 87 MU2 = 8 KNm a = 0.85c; d= 40mm 0.85fc x a x b = AS Fy 0.85(20.7) x a x 200 = 960 (414)
a =112.94
c = = =132.87mm fs = 600x
= 600x
= 419
P a g e | 44
Therefore, adopt 200mm x 300mm roof beam with 4- 20mm bar; 212mm bar.
P a g e | 45
VU = 62.33 21.11(0.30) VU = 56 KN
VC = = 2 7 2 3
2 7 2
Spacing
AV = S= =
VS < 91 KN Therefore, S = =
= 150 mm
S = 957.4 mm
P a g e | 46
b = =
b =0.021 RU = MU = =
2
= RU = 7.57 MPa
MU =122.56 KNm =
= =0.0009
1 1
P a g e | 47
min = =
min = 0.0034 w=
= w = 0.32
Mumax = fc wb (1- 0.59w) ) (1- 0.59(0.32))
Mumax = 87 KNm > Mu = 122.56 KNm Therefore, design as double reinforced. ASMAX = MAXbd = 0.016 (200) (300) AS = 960 MU1 = MUMAX MU1 = 87 KNm MU2 = MU - MUMAX = 122.56 87 MU2 = 35.56 KNm a = 0.85c; d= 40mm 0.85fc x a x b = AS Fy 0.85(20.7) x a x 200 = 960 (414) a =112.94 c = = =132.87mm fs = 600x
= 600x
= 419
P a g e | 48
N25 =? = =
2
Therefore, adopt 200mm x 300mm floor beam with 3- 25mm bar; 225mm bar.
P a g e | 49
VC = = 2 7 2 3
2 7 2
Spacing
AV = S= =
a)
2 7 2 3
= 157.1
VS > 91 KN Therefore, S = =
= 75 mm
S = 108.25 mm
P a g e | 50
fc = 20.7 MPa fy = 275 MPa WDL = 14.94 KN/m WLL = 7.96 KN/m WU = 1.4 DL + 1.7 LL = 1.4 (14.94) + 1.7 (7.96) WU = 33.84 KN/m
d = 130 20 -
= 104mm
MU =
RU = =
MU =67.67 KNm b = =
RU = 6.95 MPa
= =0.0019
1 1
P a g e | 51
min = =
min = 0.005
AS = bd = (0.005) (1000) (104) AS = 520 a) S= S = 217.5 mm say 215 mm b) 3 x h 3 X 130 = 390 mm c) 450 mm = per meter
P a g e | 52
fc = 20.7 MPa fy = 275 MPa PDL = 171.8 KN PLL = 19 KN PU = 1.4 DL + 1.7 LL = 1.4 (171.8) + 1.7 (19) PU = 282.62 KN PU = 0.80(0.85 fc (AG- AS) + (fy AS) AG = 40000 ; AST = 0.04 AG To check: PU = 0.80(0.85 fc (AG- AS) + (fy AS) = (0.70) (0.80) (0.85) (20.7) (40000- 1600) + (414 (1600)) PU = 1040.76 KN > 282.62 KN ok!
Vertical spacing of ties: a) 16 x 25mm = 400mm b) 48 x 10mm = 480mm c) Least dimension of column = 200mm Therefore, vertical spacing of ties is 200mm.
P a g e | 53
fc = 20.7 MPa fy = 414 MPa PDL = 405.57 KN PLL = 19 KN PU = 1.4 DL + 1.7 LL = 1.4 (405.57) + 1.7 (19) PU = 600.1 KN PU = 0.80(0.85 fc (AG- AS) + (fy AS) AG = 40000 ; AST = 0.04 AG To check: PU = 0.80(0.85 fc (AG- AS) + (fy AS) = (0.70) (0.80) (0.85) (20.7) (400001600) + (414 (1600)) PU = 1040.76 KN > 600.1 KN ok!
Vertical spacing of ties: d) 16 x 25mm = 400mm e) 48 x 10mm = 480mm f) Least dimension of column = 200mm Therefore, vertical spacing of ties is 200mm.
P a g e | 54
Area = =
Depth qU =
2
qU =266.71 KPa
P a g e | 55
bd 2 7 (1500) (225)
25 = 2 7 (2500) (225)
P a g e | 56
Steel Reinforcement
1500
MU = qU (0.65) (1.5)(
;=w
= 0.05
= 0.0025
min = =
N16=? = =
= 201.06 = 6.36
P a g e | 57