Professional Documents
Culture Documents
Hydraulic calculations
) (sizing
:
)(Light hazard or ordinary hazard or extra ordinary hazard
NFPA
Classification of Occupancies
Light Hazard
Occupancies.
Extra Hazard
Occupancies
Group 1
Group 2
Churches
Automobile parking
Cereal mills
Clubs
Bakeries
Chemical plants
ordinary
Aircraft
hangars
Combustible
hydraulic fluid
use areas
Beverage manufacturing
Confectionery products
Die casting
Educational
Canneries
Distilleries
Hospitals
Dairy products
Dry cleaners
Metal extruding
Plywood and
particles
Institutional
Electronic plants
Feed mills
Printing
Libraries,
Horse stables
Rubber
Museums
Laundries
Nursing or accomodation
Leather goods
manufacturing
Libraries large stack
room areas
Offices,
showrooms
Machine shops
Residential
Restaurant seating areas
Theaters and auditoriums,
Unused attics
Saw mills
Textile All kind
Upholstering
with plastic
foams
Metal working
Mercantile
Paper and pulp mills
Paper process plants
Piers and wharves
Post offices
Printing and publishing
Repair garages
Resin application area
Stages
Textile manufacturing
Tire manufacturing
Tobacco products
manufacturing
Wood machining
Wood product assembly
Asphalt
saturating
Flammabl
e liquids
spraying
Flow
coating
Manufactu
red home
Open oil
quenching
Plastics
processin
g
Solvent
cleaning
Varnish
and paint
dipping
Definition of hazards
Occupancy classifications for this standard shall relate to sprinkler design, installation, and water supply
requirements only.
(nfpa 13, 5.1.1,page 27)
)Sprinkler protection area for Extra ordinary hazard (NFPA 13, P55
(operation
) area
5
30
) (density
)(area-density chart
) Area-Density chart in (NFPA 13 , p 121
Q=K* P
Q:minimum sprinkler discharge
K: Coefficient of discharge
P:Residual pressure
(operation area)
(most remote
( pressure loss) area)
.
( friction loss due to friction )
:
-1
-2
:
Table 14.5.2.2.1 Light Hazard Pipe Schedules in (NFPA 13, 2002edition page 44)
Steel
Copper
1 in.
2 sprinklers
1 in.
2 sprinklers
1 in.
3 sprinklers
1 in.
3 sprinklers
1 in.
5 sprinklers
1 in.
5 sprinklers
2 in.
10 sprinklers
2 in.
12 sprinklers
2 in.
30 sprinklers
2 in.
40 sprinklers
3 in.
60 sprinklers
3 in.
65 sprinklers
3 in.
100 sprinklers
3 in.
115 sprinklers
4 in.
See Section 8.2
4 in.
See Section 8.2
Table 14.5.3.4 Ordinary Hazard Pipe Schedule in (NFPA 13, 2002edition page 46)
Steel
1 in.
1 in.
1 in.
2 in.
2 in..
3 in.
3 in.
4 in.
5 in.
6 in.
8 in.
2 sprinklers
3 sprinklers
5 sprinklers
10 sprinklers
20 sprinklers
40 sprinklers
65 sprinklers
100 sprinklers
160 sprinklers
275 sprinklers
See Section 8.2
Copper
1 in.
1 in.
1 in.
2 in.
2 in.
3 in.
3 in.
4 in.
5 in.
6 in.
8 in.
2 sprinklers
3 sprinklers
5 sprinklers
12 sprinklers
25 sprinklers
45 sprinklers
75 sprinklers
115 sprinklers
180 sprinklers
300 sprinklers
See Section 8.2
Steel
1 in.
1 in
1 in
2 in
2 in
3 in
1 sprinklers
2 sprinklers
5 sprinklers
8 sprinklers
15 sprinklers
27 sprinklers
Copper
1 in.
1 in
1 in
2 in
2 in
3 in
1 sprinklers
2 sprinklers
5 sprinklers
8 sprinklers
20 sprinklers
30 sprinklers
3 in
4 in
5 in
6 in
40 sprinklers
55 sprinklers
90 sprinklers
150 sprinklers
3 in
4 in
5 in
6 in
) (Hazen-Williams
:
-1
-2
-3 )(Q
-4 )(c-factor
)Table 14.4.4.5 Hazen-Williams C Values in (NFPA 13, 2002edition page 42
C Value
100
100
120
120
150
140
150
Pipe or Tube
Unlind Cast or Ductile Iron
Black Steel (dry system including Preaction
Black Steel Wet system including Deluge
Gulvanized All
Plastic (listed) All
Cement lined or Cast or Ductile iron
Copper Tupe or Stainless Steel
) (Fittings
) (friction losses :