Brainstorm with funder/executors Integrated Design and Layout Process Finalizing the design with architect

Approvals from federal and relevant authorities. Soil Test and ground Breaking Procurement of foundation raw material
Constructing Foundation of the Building Foundation Walls and Floors Installation of Sewer, Electrical, Water, Gas Utilities underground. Framing, Sheathing Plastering Roofing, and flooring Testing and inspection of structure. Rough Plumbing. Mechanical Systems Lighting and Electrical Sanitary and ceramic installations Air Sealing Tiling Painting, Cabinets, Shelving

Woodwork. Construction of playgrounds and water storage facilities. Installing infrastructure in classrooms Installation of technical equipment like computers, machines, controlling systems, networks and cameras. Finalizing and testing. Launch and opening.