You are on page 1of 2

TRIBHUVAN UNIVERSITY

INSTITUTE OF ENGINEERING
PULCHOWK CAMPUS

DEPARTMENT OF CIVIL ENGINEERING


SURVEYING INSTRUCTION COMMITTEE

SURVEY CAMP 2064


Observer: Raj Kumar/Bijay
Recorder: Govinda.
Instrument: Auto Level(42393)
Back sight BS
Station
chainage
Top
Mid
Bot
0+000
0+30.50
0+90.20
0+124.40
0+157.70
0+168.40
0+182.20
0+203.10
0+215.50
0+223.20
0+231.90
0+241.80
0+261.90
0+275.0
0+286.50

1.720
1.465
1.567
1.800
2.198
2.124
2.472
2.624
2.155
2.063
2.102
2.400
1.770
1.481

1.628
1.312
1.485
1.724
2.166
2.097
2.430
2.584
2.142
2.038
2.084
2.365
1.732
1.460

1.535
1.160
1.410
1.655
2.135
2.078
2.390
2.545
2.123
2.011
2.065
2.330
1.695
1.435

Differential Levelling (Three Wire)


Mean
BS

S1

1.628
1.312
1.487
1.726
2.166
2.100
2.431
2.584
2.140
2.037
2.084
2.365
1.732
1.459

0.185
0.305
0.157
0.145
0.063
0.046
0.082
0.079
0.032
0.052
0.037
0.070
0.075
0.046

Top

BS=
27.252

Fore Sight FS
Mid
Bot

1.650
1.812
1.045
1.408
0.774
0.972
0.952
0.478
0.698
0.640
0.754
1.106
1.448
0.403

1.593
1.530
1.665
1.520
0.950
0.860
1.315
1.220
0.753
0.730
0.926
0.880
0.890
0.825
0.455
0.433
0.675
0.653
0.622
0.605
0.723
0.692
1.040
0.975
1.420
1.392
0.368
0.334
FS=
13.395
FS- BS=13.857m

Mean
FS

S2

Rise

1.591
1.666
0.952
1.314
0.752
0.926
0.889
0.455
0.675
0.622
0.723
1.040
1.420
0.368
Rise
14.210m

0.120
0.292
0.185
0.188
0.044
0.092
0.127
0.045
0.045
0.035
0.062
0.131
0.056
0.069

0.037

Fall

0.353
0.536
0.412
1.414
1.174
1.542
2.129
1.465
1.415
1.361
1.325
0.312
1.090
Fall
0.353m

Weather: Fair
Tempreature
Date:2064-11-04
Elevation
Stadia Hz.Dst(m) Remarks
interval
s*100
s=s1+s2
P
0.305
30.50
TP1
0.597
59.70
TP2
0.342
34.20
TP3
0.333
33.30
TP4
0.107
10.70
TP5
0.138
13.80
TP6
0.209
20.90
TP7
0.124
12.40
TP8
0.077
7.70
TP9
0.087
8.70
TP10
0.099
9.90
TP11
0.201
20.10
TP12
0.131
13.10
TP13
0.115
11.50
TBM2

Fall - Rise =13.857m

Difference in level between pBM and TBM1 = h1= 17.165


13.857m
m.

SURVEY CAMP 2064


GROUP NO:17

TRIBHUVAN UNIVERSITY
INSTITUTE OF ENGINEERING
PULCHOWK CAMPUS

DEPARTMENT OF CIVIL ENGINEERING


SURVEYING INSTRUCTION COMMITTEE

SURVEY CAMP 2064


Observer: Raj Kumar/Bijay
Recorder: Govinda.
Instrument: Auto Level(42393)
back sight BS
Station
chainage
top
mid
bot
0+000
0+17.60
0+40.90
0+54.40
0+70.30
0+81.30
0+99.60
0+117.80
0+136.30
0+174.90
0+209.50
0+237.50
0+253.30

0.594
1.242
0.616
0.514
0.776
0.613
0.539
0.413
1.402
1.455
1.594
1.858

0.562
1.184
0.575
0.464
0.743
0.583
0.487
0.361
1.292
1.380
1.503
1.816

0.528
1.124
0.534
0.414
0.710
0.553
0.435
0.308
1.183
1.305
1.410
1.774

Differential Levelling (Three Wire)

Mean
BS

S1

0.561
1.183
0.575
0.464
0.743
0.583
0.487
0.361
1.292
1.380
1.502
1.816

0.066
0.118
0.082
0.100
0.066
0.060
0.104
0.105
0.219
0.150
0.184
0.084

top

BS=
10.948

Fore Sight FS
mid
bot

1.983
2.498
2.332
2.487
2.614
2.105
1.895
2.655
1.979
1.917
1.574
1.374

1.928
2.441
2.305
2.458
2.592
2.043
1.855
2.615
1.895
1.820
1.526
1.336
FS=
24.815

1.873
2.383
2.279
2.428
2.570
1.982
1.817
2.575
1.812
1.721
1.478
1.300

Mean
FS

S2

1.928
2.441
2.305
2.458
2.592
2.043
1.856
2.615
1.895
1.819
1.526
1.337
Rise
0.479m

0.110
0.115
0.053
0.059
0.044
0.123
0.078
0.080
0.167
0.196
0.096
0.074

Rise

Fall

1.367
1.257
1.730
1.994
1.849
1.460
1.369
2.254
0.603
0.439
0.024
0.479
Fall
14.346m

Weather: Fair
Tempreature
Date:2064-11-04
Elevation
Stadia Hz.Dst(m) Remarks
interval
s*100
s=s1+s2
TBM2
0.176
17.60
TP1
0.233
23.30
TP2
0.135
13.50
TP3
0.159
15.90
TP4
0.110
11.00
TP5
0.183
18.30
TP6
0.182
18.20
TP7
0.185
18.50
TP8
0.386
38.60
TP9
0.346
34.60
TP10
0.280
28.00
TP11
0.158
15.80
P

FS- BS=13.867m
Fall - Rise =13.867m

SURVEY CAMP 2064