SDR Gulmt Commitioning
SDR Gulmt Commitioning
If you wish to logging in the CC1 (Bottom) Set LAPTOP IP :192.254.1.18 (For CC1) Subnet Mask :255.255.255.0 (For CC1) If you wish to logging in the CC2 (Upper) Set LAPTOP IP : 192.254.2.18 ( For CC2) Subnet Mask :255.255.255.0 ( For CC2)
If you are logging in the CC1 (Bottom) Set IP(LMT) :192.254.1.16 (For CC1)
After Set IP in Local Area Connection,connect LAN cable to CC card in ETH 1 port. After connecting cable you just check LED status at extreme leftside of card in which eth1 is continuously blinking.
For 8800: As you select model 8800 it shows rack now you need to create card ( if cards not created )
Create Card :Right Click on slot then add board select board ok
commissioning procedure is same for all BTS Right Click on Base Station Click on Configure basic attribution
SNTP Server Address : 139. BSC No. .1 .200 Transmission Mode : Select IP
Radio Mode :
Select GSM
Click On E1/T1 Link : Right Click And Add Link ID : Select 0 (here no need to use 1,2,3) Link Type: Select BSC
Click On PPP Parameter :Right Click and add and PPP encapsulation : Select ML-PPP
HDLC Link Id: Select Link 0 Base Station IP: Put Base Station IP (118.BSC ID. HDLC No. 200 )
Click On Global Parameter :Right Click and add Working Mode : Change to IP Over PPP
SCTP Parameter Management :Right click and add Local Port ID : It should be site id Remote port ID :14592+Module no. Remote IP address: RPU IP ( 118. BSC ID. 1. 1 )
Click On OMC-B parameter: Right Click and add Operation and maintenace Gateway ip: Put RPU IP ( 118. BSC ID. 1. 1 )