You are on page 1of 71

ILLEGIBLE SCAN

Original Text:
Fix Same Facility. It works.
ILLEGIBLE SCAN
Original Text:
Return to Public Works as it was before flood with
building upgrades.
ILLEGIBLE SCAN
Original Text:
A "one-stop" City Operations Center makes sense from a
customer and City coordination point of view. Don't understand
why the Westdale Mall option is so expensive.
ILLEGIBLE SCAN
Original Text:
Would satellites be of use for upgrades - cut travel
time & distance
major (?) on original location
ILLEGIBLE SCAN
Original Text:
Would love workout area and showers
Why flood insurance for Option C? (build out of flood
area)
Prefer engineering to be part of central services. Not
mixed with maintenance utilities. Boards don't show
what is proposed for engineering dept.

You might also like