You are on page 1of 2

fleHenclosure

Approved

COMMISSIONING REPORT
Document Id

Revision

Jonas Hallstrom
Issued by

7136-Q-REP-0001
Date

E
Page

Elinor Axelsson

15-11-2012

2 (11)

Commissioning details
E-site modular solution S1500 70681

1.1 System description


Product Version Serial no Settings fIle No

1.2 Subsystem information


Subsystem Genset power converter Solar power converter Diesel generator set Type/spec R48-3500e TS-MPPT-60 Manufacturer EMERSON MORNING STAR GENERATOR LOGIC

1.3 Installation details


Site Customer Customer address BUSEKERA AIRTEL TZ AIRTEL TANZANIA Contact person Telephone Mobile phone Fax E-mail
GISBERT SANGA

+255 (0)784670653

1.4 Documents
Doc no Document Commissioning Manual Commissioning Report (this document) Document Id / Revision 71OO-Q-MAN -020 7136-Q-REP-000I Appendix REV 0 REVD

Declaration
I hereby undertake that the E-site Modular Solution referenced above has been commissioned by me, in accordance with this prescribed commissioning report and that all of the installation points specified have been correctly followed/checked. Date 2911112012

Commissioner

ROBERT E. MWAIPUNGU

Signature

Approved

fleHenclosure

COMMISSIONING
Document Id

REPORT
Revisbn

Jonas Hallstrom
Issued by

7136-Q-REP-0001
Date

E
Page

Elinor Axelsson

15-11-2012

11 (11)

SIGNING OF DOCUMENT

Punch list Accepted by: Flexenclosure representative

CONTEC ENGINEERS LTD Company

~~~
Signature.

...

MARA-BUSEKERA AREA (29/11/2012) Place and date

ROBERT E. MWAIPUNGU Name (block letters)

Customer representative

Company

Signature.

Place and date

Name (block letters

You might also like