Outage Report Plant Level:1005-Rihand Superthermal Power
UNIT01
STAGE1
UNIT03
UNIT04
STAGE2
Item Description
Y-No
UNIT02 Y-MU
Y-MU
STAGE1 Y-%
Y-%
UNIT03 Y-Hr
Y-Hr
UNIT04 Y-No
Y-No
Total Y-MU
UNIT01 Y-MU
UNIT02 Y-%
STAGE1 Y-Hr
UNIT03 Y-No
STAGE2 Y-MU
Total Y-%
UNIT01 Y-%
UNIT02 Y-Hr
STAGE1 Y-No
UNIT04 Y-MU
STAGE2 Y-%
Total Y-Hr
49.075
1.235
103.175
3
177.592
1.603
UNIT01 Y-Hr
UNIT02 Y-No
UNIT03 Y-MU
UNIT04 Y-%
STAGE2 Y-Hr
Total Y-No
1.120
108.200
5
113.517
2.027
140.383
98.150
3
64.075
2.592
177.592
13
67
5
83
1
1
18.558
1.859
100.000
6
15.5
0.17
37.1
15.517
0.424
162.883
5
21.625
0.247
37.867
0.216
20.279
21.625
0.432
18.933
0.231
19.733
115.51
0.451
19.733
39.4
0.22
0.670
33.917
2
58.6
1
29.342
0.387
46.300
2
1
58.658
0.335
32.075
0.670
29.329
17-FEEDER PROBLEM
18-OIL GUN PROBLEM
19-APH PROBLEM
20-ESP PROBLEM
21-CLINKER GRINDER/SCRAPPER CONVEYOR
22-LEAKAGE AT VARIOUS PLACES
23-SEAL AIR FAN PROBLEM
24-BOILER METAL TEMPERATURE HIGH
25-FEED REGULATING STATION PROBLEM
26-ATTEMPERATION STATION PROBLEM
27-SAFETY VALVE FLOATING
28-HIGH CHEM PARAMTRS DUE TO WORK IN SG
29-CC PUMP PROBLEM
30-FLUE GAS LEAKAGE PROBLEM
31-MECHANICAL MAINTENANCE INDUCED PROBLEM
32-MISCELLANEOUS
33-WHRB INLET DAMPER PROBLEM
34-WHRB BLIND PLATE PROBLEM
35-WHRB BYPASS DAMPER PROBLEM
36-WHRB DUCT BURNER PROBLEM
37-WHRB FOULING
38-WHRB EXPANSION JOINT PROBLEM
39-MS PARAMETER MISMATCH (WHRB)
40-WHRB RAIN DAMPER PROBLEM (EXHAUST/BYPASS
41-WHRB'S NOT AVAILABLE
42-OCCURRENCE OF FIRE
43-DEWATERING PROBLEM
44-SHORT S/D FOR ALL AREA.