RIHAND Unit Outage Report from 01.04.2010 to 31.03.2011


Plant Unit
Reason Sub Reason
To Date To Time Outage Duration Loss in MU

From Date
Outage (No)

From Time

RhSTPS UNIT02 PLANNED OUTAGE "PLANNED OVERHAUL( BLR,TURB&GEN )"


01.04.2010
1:25:00 22.05.2010
2:54:00
1225:29:00 612.74 1
RhSTPS UNIT04 BOILER & AUXILARIES.
WATER WALL TUBE LEAKAGE 05.04.20
10
11:30:00
07.04.2010
4:42:00
41:12:00 20.60 1
RhSTPS UNIT03 BOILER & AUXILARIES.
LTSH TUBE LEAKAGE
10.05.20
10
17:34:00
12.05.2010
7:26:00
37:52:00 18.93 1
RhSTPS UNIT02 "GEN, AUXLIARIES & ELECTRICAL SYSTEM" 415 V BUS PROBLE
M
22.05.2010
7:10:00 22.05.2010
10:44:00
3:34:00
1.78
1
RhSTPS UNIT02 C& I SYSTEM
MALOPERATION CARDS/PROTECTION 27.05.20
10
5:03:00 27.05.2010
6:38:00
1:35:00 0.79
1
RhSTPS UNIT01 "GEN, AUXLIARIES & ELECTRICAL SYSTEM" ISOLATOR PROBLEM
01.06.2010
23:52:00
02.06.2010
15:52:00
16:00:00
8.00
1
RhSTPS UNIT02 "GEN, AUXLIARIES & ELECTRICAL SYSTEM" ISOLATOR PROBLEM
01.06.2010
23:52:00
02.06.2010
1:48:00
1:56:00 0.97
1
RhSTPS UNIT03 "GEN, AUXLIARIES & ELECTRICAL SYSTEM" ISOLATOR PROBLEM
01.06.2010
23:52:00
02.06.2010
5:27:00
5:35:00 2.79
1
RhSTPS UNIT04 "GEN, AUXLIARIES & ELECTRICAL SYSTEM" ISOLATOR PROBLEM
01.06.2010
23:52:00
02.06.2010
3:51:00
3:59:00 1.99
1
RhSTPS UNIT02 TURBINE & AUXILARIES
SHAFT VIBRATION HIGH
02.06.20
10
3:41:00 02.06.2010
5:28:00
1:47:00 0.89
1
RhSTPS UNIT02 BOILER & AUXILARIES.
LTSH TUBE LEAKAGE
03.06.20
10
22:35:00
05.06.2010
17:50:00
43:15:00 21.63
1
RhSTPS UNIT04 BOILER & AUXILARIES.
WATER WALL TUBE LEAKAGE 16.06.20
10
4:27:00 18.06.2010
9:25:00
52:58:00 26.48 1
RhSTPS UNIT02 C& I SYSTEM
MISCELLANEOUS 29.06.2010
12:09:00
29.06.2010
13:58:00
1:49:00 0.91
1
RhSTPS UNIT04 BOILER & AUXILARIES.
WATER WALL TUBE LEAKAGE 07.07.20
10
2:12:00 08.07.2010
17:26:00
39:14:00 19.62 1
RhSTPS UNIT01 PLANNED OUTAGE PLANNED OVERHAUL( ONLY BOILER ) 12.08.20
10
23:20:00
10.09.2010
3:48:00
676:28:00 338.23 1
RhSTPS UNIT02 BOILER & AUXILARIES.
WATER WALL TUBE LEAKAGE 13.08.20
10
19:03:00
15.08.2010
2:05:00
31:02:00 15.52 1
RhSTPS UNIT03 BOILER & AUXILARIES.
WATER WALL TUBE LEAKAGE 20.08.20
10
4:41:00 21.08.2010
17:48:00
37:07:00 18.56 1
RhSTPS UNIT04 BOILER & AUXILARIES.
REHEATER TUBE LEAKAGE 29.08.20
10
21:43:00
01.09.2010
13:52:00
64:09:00 32.08
1
RhSTPS UNIT04 "GEN, AUXLIARIES & ELECTRICAL SYSTEM" GT PROBLEM
07.09.2010
21:12:00
08.09.2010
2:14:00
5:02:00 2.52
1
RhSTPS UNIT04 "GEN, AUXLIARIES & ELECTRICAL SYSTEM" GT PROBLEM
08.09.2010
5:40:00 13.09.2010
4:25:00
118:45:00 59.38 1
RhSTPS UNIT03 BOILER & AUXILARIES.
REHEATER TUBE LEAKAGE 12.09.20
10
23:29:00
15.09.2010
4:39:00
53:10:00 26.58 1
RhSTPS UNIT02 OPERATION INDUCED
MISCELLANEOUS 20.09.2010

10:02:00
20.09.2010
12:17:00
2:15:00 1.13
1
RhSTPS UNIT03 "GEN, AUXLIARIES & ELECTRICAL SYSTEM" MISCELLANEOUS
06.10.2010
13:46:00
06.10.2010
16:58:00
3:12:00
1.60
1
RhSTPS UNIT01 BOILER & AUXILARIES.
ECONOMISER TUBE LEAKAGE 13.11.20
10
3:04:00 14.11.2010
18:32:00
39:28:00 19.73 1
RhSTPS UNIT02 BOILER & AUXILARIES.
SUPERHEATER TUBE LEAKAGE
18.11.2010
7:55:00 19.11.2010
17:50:00
33:55:00 16.96
1
RhSTPS UNIT04 OTHER MISCELLANEOUS 08.12.2010
10:30:00
08.12.2010
13:34:00
3:04:00 1.53
1
RhSTPS UNIT02 "GEN, AUXLIARIES & ELECTRICAL SYSTEM" HYDROGEN COOLING
SYSTEM 14.12.2010
10:39:00
14.12.2010
12:09:00
1:30:00 0.75
1
RhSTPS UNIT01 BOILER & AUXILARIES.
SUPERHEATER TUBE LEAKAGE
17.01.2011
13:04:00
19.01.2011
23:45:00
58:41:00
29.34 1
RhSTPS UNIT04 BOILER & AUXILARIES.
WATER WALL TUBE LEAKAGE 13.02.20
11
23:59:00
15.02.2011
5:28:00
29:29:00 14.74 1