RIHAND Unit Outage Report from 01.04.2010 to 28.02.

2011
Plant

Unit

Reason

GEN, AUXLIARIES &


RhSTPS UNIT01 ELECTRICAL SYSTEM
RhSTPS UNIT01 PLANNED OUTAGE
RhSTPS UNIT01 BOILER & AUXILARIES.
RhSTPS UNIT01 BOILER & AUXILARIES.
RhSTPS UNIT02 PLANNED OUTAGE
GEN, AUXLIARIES &
RhSTPS UNIT02 ELECTRICAL SYSTEM
RhSTPS UNIT02 C& I SYSTEM
GEN, AUXLIARIES &
RhSTPS UNIT02 ELECTRICAL SYSTEM
RhSTPS UNIT02 TURBINE & AUXILARIES
RhSTPS UNIT02 BOILER & AUXILARIES.
RhSTPS UNIT02 C& I SYSTEM
RhSTPS UNIT02 BOILER & AUXILARIES.
RhSTPS UNIT02 OPERATION INDUCED
RhSTPS UNIT02 BOILER & AUXILARIES.
GEN, AUXLIARIES &
RhSTPS UNIT02 ELECTRICAL SYSTEM
RhSTPS UNIT03 BOILER & AUXILARIES.
GEN, AUXLIARIES &
RhSTPS UNIT03 ELECTRICAL SYSTEM
RhSTPS UNIT03 BOILER & AUXILARIES.
RhSTPS UNIT03 BOILER & AUXILARIES.
GEN, AUXLIARIES &
RhSTPS UNIT03 ELECTRICAL SYSTEM

From Date From Time To Date

ISOLATOR PROBLEM
PLANNED OVERHAUL( ONLY
BOILER )

01.06.2010

23:52:00 02.06.2010 15:52:00

16:00:00

12.08.2010

23:20:00 10.09.2010

3:48:00

676:28:00

338.23

3:04:00 14.11.2010 18:32:00

39:28:00

19.73

13:04:00 19.01.2011 23:45:00

58:41:00

29.34

1225:29:00

612.74

ECONOMISER TUBE LEAKAGE 13.11.2010


SUPERHEATER TUBE
LEAKAGE
17.01.2011
PLANNED OVERHAUL(
BLR,TURB&GEN )
01.04.2010

1:25:00 22.05.2010

To Time Outage Duration

Outage
Loss in MU (No)

Sub Reason

2:54:00

415 V BUS PROBLEM


MALOPERATION
CARDS/PROTECTION

22.05.2010

7:10:00 22.05.2010 10:44:00

3:34:00

1.78

27.05.2010

5:03:00 27.05.2010

6:38:00

1:35:00

0.79

ISOLATOR PROBLEM
SHAFT VIBRATION HIGH
LTSH TUBE LEAKAGE
MISCELLANEOUS

01.06.2010
02.06.2010
03.06.2010
29.06.2010

02.06.2010 1:48:00
02.06.2010 5:28:00
05.06.2010 17:50:00
29.06.2010 13:58:00

1:56:00
1:47:00
43:15:00
1:49:00

0.97
0.89
21.63
0.91

1
1
1
1

WATER WALL TUBE LEAKAGE 13.08.2010


MISCELLANEOUS
20.09.2010
SUPERHEATER TUBE
LEAKAGE
18.11.2010

19:03:00 15.08.2010 2:05:00


10:02:00 20.09.2010 12:17:00

31:02:00
2:15:00

15.52
1.13

1
1

7:55:00 19.11.2010 17:50:00

33:55:00

16.96

HYDROGEN COOLING SYSTEM 14.12.2010


LTSH TUBE LEAKAGE
10.05.2010

10:39:00 14.12.2010 12:09:00


17:34:00 12.05.2010 7:26:00

1:30:00
37:52:00

0.75
18.93

1
1

ISOLATOR PROBLEM

23:52:00 02.06.2010

5:27:00

5:35:00

2.79

WATER WALL TUBE LEAKAGE 20.08.2010


REHEATER TUBE LEAKAGE
12.09.2010

4:41:00 21.08.2010 17:48:00


23:29:00 15.09.2010 4:39:00

37:07:00
53:10:00

18.56
26.58

1
1

MISCELLANEOUS

13:46:00 06.10.2010 16:58:00

3:12:00

1.60

01.06.2010

06.10.2010

23:52:00
3:41:00
22:35:00
12:09:00

Plant

Unit

Reason

Sub Reason

From Date From Time To Date

To Time Outage Duration

Outage
Loss in MU (No)

RhSTPS UNIT04 BOILER & AUXILARIES.


GEN, AUXLIARIES &
RhSTPS UNIT04 ELECTRICAL SYSTEM

WATER WALL TUBE LEAKAGE 05.04.2010

11:30:00 07.04.2010

4:42:00

41:12:00

20.60

ISOLATOR PROBLEM

01.06.2010

23:52:00 02.06.2010

3:51:00

3:59:00

1.99

RhSTPS UNIT04 BOILER & AUXILARIES.

WATER WALL TUBE LEAKAGE 16.06.2010

4:27:00 18.06.2010

9:25:00

52:58:00

26.48

RhSTPS UNIT04 BOILER & AUXILARIES.


RhSTPS UNIT04 BOILER & AUXILARIES.
GEN, AUXLIARIES &
RhSTPS UNIT04 ELECTRICAL SYSTEM
GEN, AUXLIARIES &
RhSTPS UNIT04 ELECTRICAL SYSTEM
RhSTPS UNIT04 OTHER

WATER WALL TUBE LEAKAGE 07.07.2010


REHEATER TUBE LEAKAGE
29.08.2010

2:12:00 08.07.2010 17:26:00


21:43:00 01.09.2010 13:52:00

39:14:00
64:09:00

19.62
32.08

1
1

GT PROBLEM

07.09.2010

21:12:00 08.09.2010

5:02:00

2.52

GT PROBLEM
MISCELLANEOUS

08.09.2010
08.12.2010

5:40:00 13.09.2010 4:25:00


10:30:00 08.12.2010 13:34:00

118:45:00
3:04:00

59.38
1.53

1
1

RhSTPS UNIT04 BOILER & AUXILARIES.

WATER WALL TUBE LEAKAGE 13.02.2011

23:59:00 15.02.2011

29:29:00

14.74

2:14:00

5:28:00