You are on page 1of 18

MONITORING HARIAN FUR

Periode : AGU
Actual Report
Tanggal

Lokasi

1-Aug-13
2-Aug-13
3-Aug-13
4-Aug-13
5-Aug-13
6-Aug-13

Spasing
(meters)

Burden
(meters)

Depth
(meters)

PitLimit
Pit Limit
0-Jan-00
0-Jan-00
0-Jan-00
0-Jan-00

4.00
4.00
4.00
4.00
4.00
4.00

4.00
4.00
4.00
4.00
4.00
4.00

9,592.40
-

7-Aug-13

0-Jan-00

4.00

4.00

8-Aug-13
9-Aug-13
10-Aug-13
11-Aug-13
12-Aug-13
13-Aug-13

pit Limit
0-Jan-00
0-Jan-00
0-Jan-00
Pit Limit
Pit limit

4.00
4.00
4.00
4.00
4.00
4.00

4.00
4.00
4.00
4.00
4.00
4.00

14-Aug-13

Pit limit

4.00

4.00

15-Aug-13 Pit limit


16-Aug-13 Pit limit
17-Aug-13 Pit limit
18-Aug-13 Pit limit
19-Aug-13 Pit limit
20-Aug-13 PIT Limit
21-Aug-13 pit Limit
22-Aug-13 Pit Limit
23-Aug-13 Pit Limit
24-Aug-13 Pit Limit
25-Aug-13 Pit Limit
26-Aug-13 Pit Limit
27-Aug-13 Pit Limit
28-Aug-13 Pit Limit
29-Aug-13 Pit Limit
30-Aug-13 Pit Limit
31-Aug-13 Pit Limit

4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00

4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00

GRAND
TOTAL

4.00

4.00

Total

m/hour =

C/DAT/BOR/asyarLI

Target Kontrak Pemboran


Density Batukapur
Target Powder Factor
Target Fuel Consumtion
Target Productivity

: 300 Mtr/Hari
:
:
:
:

2,65 M /Ton
135 Gr/Ton
35 - 45 Ltr/Jam
30 M/Jam

Hole
(holes)

Start HM Finish HM Running


(hour)
(hour)
(hour)
(9,592.40)
-

(9,592.40)

0.00
9,000

-9592.40

TargetUoA

: 75%

TargetPoA

: 85%

Jumlah Kedalam Pemboran

Jumlah Pemakaian HM

0.00 Jam

Jumlah Pemakaian Solar


Total Produksi

130 Liter

BD = BREAK DOWN

Meter

- Ton

ITORING HARIAN FURUKAWA HCR-1500 ED II


Periode : AGUSTUS 2013
Alokasi
Jam Kerja
BD (hour)
WOHH
(hour)
24.00
24.00
-

Effective
Time WH Fuel (liter)
(hour)

Stdby
((hour)

Metric
ANFO
(Kg)

Productio
n (ton)

PF
(gr/ton)

Fuel Cons
(l/h)

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!

#DIV/0!

24.00
24.00
24.00

24.00
24.00
24.00

130.00
-

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

96.00

96.00

130.00

#DIV/0!

ltr/hour =

(0)

(0.01)

Mengetahui,
Ka. Biro PBM

Iskandar Z Lubis

Performance

Actu
PoA
(%)

Tanggal

Lokasi

Spasing
(meters)

- -39968%
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!

0%
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

1-Aug-13
2-Aug-13
3-Aug-13
4-Aug-13
5-Aug-13
6-Aug-13

Front 2
Front 2
Front 1
Front 2
Front 2
Front 2

4.00
4.00
4.00
4.00
4.00
4.00

#DIV/0!

#DIV/0!

#DIV/0!

7-Aug-13

Logo

4.00

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

8-Aug-13
9-Aug-13
10-Aug-13
11-Aug-13
12-Aug-13
13-Aug-13

Logo
Logo
Logo
Logo
Logo
Logo

4.00
4.00
4.00
4.00
4.00
4.00

#DIV/0!

#DIV/0!

#DIV/0!

14-Aug-13

PitLimit

4.00

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0%
#DIV/0!
0%
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0%

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0%
#DIV/0!
0%
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0%

15-Aug-13
16-Aug-13
17-Aug-13
18-Aug-13
19-Aug-13
20-Aug-13
21-Aug-13
22-Aug-13
23-Aug-13
24-Aug-13
25-Aug-13
26-Aug-13
27-Aug-13
28-Aug-13
29-Aug-13
30-Aug-13
31-Aug-13

Logo
Logo
Logo
Logo
Logo
LPX
Logo
LPX
KP.BARU
KP.BARU
KP.BARU
KP.BARU
KP.BARU
KP.BARU
KP.BARU
KP.BARU
KP.BARU

4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
0.00

- -9992%

0%

Total

GRAND
TOTAL

3.87

Productivi
ty (m/h)

UoA
(%)

293.92

C/DAT/BOR/asyarLI

Target Kontrak Pemboran

Density Batukapur
Target Powder Factor
Target Fuel Consumtion
Target Productivity

:
:
:
:

Menyetujui,
Ka. Bidang PBK

Romi Abdilah, ST

TargetUoA

TargetPoA

Jumlah Kedalam Pemboran

Jumlah Pemakaian HM

Jumlah Pemakaian Solar


Total Produksi

BD = BREAK DOWN

MONITORING HARIAN SANVIK DP1100 DMPeriode : AGUSTUS 2013


Actual Report
Burden
(meters)

Depth
(meters)

Hole
(holes)

Start HM Finish HM Running


(hour)
(hour)
(hour)

Alokasi
Jam Kerja
BD (hour)
WOHH
(hour)
23.67
23.33
0.25
23.33
1.50
23.50
7.17
23.50
0.42
21.83
5.00

4.00
4.00
4.00
4.00
4.00
4.00

138.70
402.80
243.70
282.00
282.20
348.20

34.00
47.00
30.00
45.00
28.00
40.00

8,914.10
8,931.00
8,947.00
8,964.10
8,976.70
8,994.30

8,931.00
8,947.00
8,964.10
8,976.70
8,994.30
9,002.70

16.90
16.00
17.10
12.60
17.60
8.40

4.00

248.60

25.00

9,002.70

9,007.30

4.60

19.00

4.00
4.00
4.00
4.00
4.00
4.00

311.80
253.40
315.00

39.00
27.00
38.00

9,007.30
9,007.30
9,007.30
9,022.50
9,033.60
9,050.20

9,007.30
9,007.30
9,022.50
9,033.60
9,050.20
9,067.10

15.20
11.10
16.60
16.90

24.00
24.00
22.58
24.25
23.00
23.00

2.83
11.17
0.67
4.83

4.00

171.70

21.00

9,067.10

9,073.20

6.10

23.92

13.33

4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
0.00

33.90
356.40
272.00
278.60
301.90
239.60
347.80
353.10
400.40
297.40
267.50
315.20
414.80
-

10.00
45.00
31.00
31.00
36.00
27.00
48.00
40.00
42.00
30.00
35.00
34.00
49.00
-

9,073.20
9,089.10
9,105.60
9,122.30
9,137.00
9,146.80
9,164.60
9,182.50
9,201.00
9,215.40
9,224.10
9,240.00
9,257.90
9,258.00
9,258.00
9,258.00
9,258.00

9,089.10
9,105.60
9,122.30
9,137.00
9,146.80
9,164.60
9,182.50
9,201.00
9,215.40
9,224.10
9,240.00
9,257.90
9,258.00
9,258.00
9,258.00
9,258.00
9,258.00

15.90
16.50
16.70
14.70
9.80
17.80
17.90
18.50
14.40
8.70
15.90
17.90
0.10
-

23.00
22.42
22.92
23.00
23.00
23.00
23.00
23.00
23.00
23.00
23.33
23.67
24.00
24.00
24.00
24.00
24.00

0.83
3.83
1.50
1.67
5.33
0.58
0.25
1.33
13.00
1.17
1.25
24.00
24.00
24.00
24.00
24.00

3.87

6,876.70

832.00

343.90

719.25

197.92

m/hour =
300 Mtr/Hari
3

2,65 M /Ton
135 Gr/Ton
35 - 45 Ltr/Jam
30 M/Jam

20.00

12
3,200

10,076.70

153.00

75%
85%

6,876.70 Meter
0.00 Jam
13,318 Liter
291,572 Ton

ARIAN SANVIK DP1100 DM-03


ode : AGUSTUS 2013
Stdby
((hour)

Effective
Time WH Fuel (liter)
(hour)

Metric
ANFO
(Kg)

Production
(ton)

Performance

PF
(gr/ton)

Fuel Cons Productivi


(l/h)
ty (m/h)

9.33
6.42
7.92
6.83
7.92
6.25

14.33
16.67
13.92
9.50
15.17
10.58

500.00
580.00
625.00
480.00
580.00
710.00

5,880.88
17,078.72
10,332.88
11,956.80
11,965.28
14,763.68

29.59
36.25
36.55
38.10
32.95
84.52

8.21
25.18
14.25
22.38
16.03
41.45

19.00

140.00

10,540.64

30.43

54.04

24.00
24.00
6.58
4.50
8.00
5.08

13.17
8.58
14.33
13.08

190.00
570.00
500.00
545.00

13,220.32
10,744.16
13,356.00

#DIV/0!
#DIV/0!
#DIV/0!
-

#DIV/0!
#DIV/0!
12.50
51.35
30.12
32.25

#DIV/0!
#DIV/0!
28.09
15.27
18.64

6.08

4.50

370.00

7,280.08

60.66

28.15

6.83
6.33
6.67
6.83
9.67
5.92
6.42
7.08
9.50
2.33
7.75
6.50
-

15.33
12.25
14.75
14.50
8.00
16.50
16.33
15.92
12.17
7.67
14.42
15.92
-

450.00
680.00
600.00
615.00
360.00
661.00
685.00
735.00
620.00
500.00
600.00
660.00
362.00
-

1,437.36
15,111.36
11,532.80
11,812.64
12,800.56
10,159.04
14,746.72
14,971.44
16,976.96
12,609.76
11,342.00
13,364.48
17,587.52
-

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

28.30
41.21
35.93
41.84
36.73
37.13
38.27
39.73
43.06
57.47
37.74
36.87
3,620.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

2.13
21.60
16.29
18.95
30.81
13.46
19.43
19.09
27.81
34.18
16.82
17.61
4,148.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

297.58 ########

291,572.08

38.73

20.00

223.75

ltr/hour =

39

Mengetahui,
Pj. Ka. Biro PBM

Menyetujui,
Ka. Bidang DB & MS

Dedi M Sidiq, ST

Ariyan Trisno

Performance
UoA
(%)

PoA
(%)

Tanggal

71%
69%
73%
54%
75%
38%

100%
99%
94%
70%
98%
77%

1-Aug-13 Front 1 dan 2


2-Aug-13
0-Jan-00
3-Aug-13
Front 1
4-Aug-13
Front 2
5-Aug-13
Front 2
6-Aug-13
Front 2

24%

100%

0%
0%
67%
46%
72%
73%

100%
100%
87%
54%
97%
79%

26%

Standby 1/2 hari karena akan libur


Hari raya

Lokasi

7-Aug-13

Front 2

8-Aug-13
9-Aug-13
10-Aug-13
11-Aug-13
12-Aug-13
13-Aug-13

Front 2
Front 2
Front 2
Front 2
Front 2
Front 2

44%

14-Aug-13

Front 2

69%
74%
73%
64%
43%
77%
78%
80%
63%
38%
68%
76%
0%
0%
0%
0%
0%

96%
83%
93%
93%
77%
97%
99%
100%
94%
43%
95%
95%
0%
0%
0%
0%
0%

15-Aug-13
16-Aug-13
17-Aug-13
18-Aug-13
19-Aug-13
20-Aug-13
21-Aug-13
22-Aug-13
23-Aug-13
24-Aug-13
25-Aug-13
26-Aug-13
27-Aug-13
28-Aug-13
29-Aug-13
30-Aug-13
31-Aug-13

Front 2
Front 2
Front 2
Front 2
Front 2
Front 2
Front 2
Front 2
Front 2
Front 2
Front 2
Front 2
Front 2
Front 2
Front 2
Front 2
Front 2

48%

72%

Total

GRAND
TOTAL

Libur hari raya 1434 H

C/DAT/BOR/asyarLI

Target Kontrak Pemboran


Density Batukapur
Target Powder Factor
Target Fuel Consumtion
Target Productivity

Menyetujui,
Ka. Bidang DB & MS

TargetUoA
TargetPoA

Jumlah Kedalam Pemboran


Jumlah Pemakaian HM

Ariyan Trisno

Jumlah Pemakaian Solar


Total Produksi
BD = BREAK DOWN

MONITORING HARIAN SANVIK DP1


Periode : AGUSTUS 2013
Actual Report
Spasing
(meters)

Burden
(meters)

4.00
4.00
4.00
4.00
4.00
4.00

4.00
4.00
4.00
4.00
4.00
4.00

355.10
443.30
301.60
422.50
383.40
355.30

40.00
45.00
33.00
45.00
40.00
40.00

2,019.60
2,037.20
2,053.70
2,070.20
2,088.10
2,107.20

2,037.20
2,053.70
2,070.20
2,088.10
2,107.20
2,125.10

17.60
16.50
16.50
17.90
19.10
17.90

4.00

4.00

304.10

32.00

2,125.10

2,130.00

4.90

24.00

4.00
4.00
4.00
4.00
4.00
4.00

4.00
4.00
4.00
4.00
4.00
4.00

96.90
470.50
284.50

16.00
63.00
35.00

2,130.00
2,130.00
2,130.00
2,145.60
2,162.10
2,178.30

2,130.00
2,130.00
2,145.60
2,162.10
2,178.30
2,195.70

15.60
16.50
16.20
17.40

24.00
24.00
22.25
22.83
23.00
24.00

4.00

4.00

294.80

38.00

2,195.70

2,213.30

17.60

23.00

4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00

4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00

360.30
306.80
243.60
315.60
284.50
247.40
388.90
376.20
355.60
308.90
360.70
246.20
382.50
332.20
324.60
240.90
407.50

53.00
33.00
42.00
36.00
30.00
27.00
42.00
41.00
43.00
35.00
42.00
36.00
45.00
40.00
45.00
31.00
55.00

2,213.30
2,230.80
2,246.80
2,262.60
2,273.40
2,286.40
2,303.80
2,322.50
2,341.20
2,357.50
2,375.70
2,390.70
2,409.40
2,417.70
2,441.90
2,455.90
2,472.60

2,230.80
2,246.80
2,262.60
2,273.40
2,286.40
2,303.80
2,322.50
2,341.20
2,357.50
2,375.70
2,390.70
2,409.40
2,417.70
2,441.90
2,455.90
2,472.60
2,494.30

17.50
16.00
15.80
10.80
13.00
17.40
18.70
18.70
16.30
18.20
15.00
18.70
8.30
24.20
14.00
16.70
21.70

23.00
22.67
25.17
23.00
23.00
23.75
23.00
23.00
23.08
23.25
22.83
23.67
22.67
22.75
23.75
23.08
23.25

4.00

4.00

9,194.40

1,103.00

453.00

723.75

m/hour =

20.30

yarLI

Depth
(meters)

: 300 Mtr/Hari
:
:
:
:

2,65 M /Ton
135 Gr/Ton
35 - 45 Ltr/Jam
30 M/Jam

Hole
(holes)

Start HM Finish HM
(hour)
(hour)

Running
(hour)

Alokasi
Jam Kerja
WOHH
(hour)
23.50
23.58
23.50
23.67
23.58
23.92

12
3,200

12,394.40

176.10

: 75%
: 85%
:
:
:
:

9,194.40 Meter
0.00 Jam
17,602 Liter
389,843 Ton

RING HARIAN SANVIK DP1100 DM-05


Periode : AGUSTUS 2013

BD (hour)

Stdby
((hour)

Effective
Time WH Fuel (liter)
(hour)

Metric
ANFO
(Kg)

Production
(ton)

PF
(gr/ton)

Fuel Cons
(l/h)

0.67
1.25
0.50
-

6.83
8.75
9.00
8.92
6.42
8.17

16.00
14.83
14.50
13.50
16.75
15.75

730.00
640.00
645.00
640.00
734.00
710.00

15,056.24
18,795.92
12,787.84
17,914.00
16,256.16
15,064.72

41.48
38.79
39.09
35.75
38.43
39.66

19.58

4.42

550.00

12,893.84

112.24

3.33
1.08
-

24.00
24.00
7.17
6.75
8.92
8.17

11.75
15.00
14.08
15.83

210.00
620.00
620.00
650.00

4,108.56
19,949.20
12,062.80

#DIV/0!
#DIV/0!
#DIV/0!
-

#DIV/0!
#DIV/0!
13.46
37.58
38.27
37.36

7.50

15.50

650.00

12,499.52

36.93

1.83
8.50
5.17
0.17
0.58
0.92
1.00
1.00
0.17
7.25
0.25
0.83

7.00
8.67
7.58
5.33
8.42
7.33
5.92
5.33
9.83
6.83
10.50
6.33
6.17
13.92
4.33
7.58
-

16.00
14.00
15.75
9.17
9.42
16.25
16.50
17.67
12.33
15.42
12.33
17.33
16.50
8.67
12.17
15.25
-

650.00
650.00
590.00
375.00
520.00
550.00
695.00
710.00
580.00
665.00
640.00
540.00
698.00
630.00
480.00
580.00
650.00

15,276.72
13,008.32
10,328.64
13,381.44
12,062.80
10,489.76
16,489.36
15,950.88
15,077.44
13,097.36
15,293.68
10,438.88
16,218.00
14,085.28
13,763.04
10,214.16
17,278.00

37.14
40.63
37.34
34.72
40.00
31.61
37.17
37.97
35.58
36.54
42.67
28.88
84.10
26.03
34.29
34.73
29.95

34.50

275.25

392.67

17,602.00

389,842.56

38.86

ltr/hour =

39

Mengetahui,
Pj. Ka. Biro PBM

Dedi M Sidiq, ST

Performance
Productivi
ty (m/h)

UoA
(%)

PoA
(%)

20.18
26.87
18.28
23.60
20.07
19.85

75%
70%
70%
76%
81%
75%

97%
100%
100%
95%
98%
100%

62.06

20%

100%

#DIV/0!
#DIV/0!
5.87
29.04
16.35

0%
0%
70%
72%
70%
72%

100%
100%
85%
95%
100%
100%

16.75

77%

100%

20.59
19.18
15.42
29.22
21.88
14.22
20.80
20.12
21.82
16.97
24.05
13.17
46.08
13.73
23.19
14.43
18.78

76%
71%
63%
47%
57%
73%
81%
81%
71%
78%
66%
79%
37%
106%
59%
72%
93%

100%
100%
93%
63%
78%
99%
97%
100%
96%
96%
96%
100%
100%
99%
69%
99%
96%

20.30

63%

95%

Standby 1/2 hari karena akan libur Hari


raya
Libur hari raya 1434 H

Shift 2 10 lobang ditimbun karena


akan dipakai akses HD

Menyetujui,
Ka. Bidang DB & MS

Ariyan Trisno