You are on page 1of 1

10.

0 Hazards and Hazardous Materials

City of Pittsburg

Table 10-5: Pipeline Release Volumes and Probabilities


Rupture Event
Pipeline

Segment Name

Leak Event

Worst-case
Rupture
Spill Volume
(gallons)

Probability of
Rupture

Return
Period*

(event/year)

Probability of
Leak
(event/year)

Return
Period*

(year)

Worst-case Leak
Spill Volume
(gallons)

(year)

San Pablo Bay

Shell 1

429,100

0.00342

290

4,200

0.01369

73

San Pablo Bay

Shell 2

161,000

0.00118

850

4,200

0.00475

210

San Pablo Bay

Shell 3

47,400

0.00024

4,170

4,200

0.00096

1,040

San Pablo Bay

Shell 4

64,000

0.00038

2,630

4,200

0.00151

660

San Pablo Bay

Shell 5

109,200

0.00075

1,330

4,200

0.00302

330

KLM Pipeline
Connection

KLM Pipeline
Connection

232,800

0.00019

5,260

4,200

0.00077

1,300

Rail Pipeline

Rail Pipeline

49,850

0.00026

3,850

4200

0.00103

970

On-site Network

Header 1

42,200

0.00003

33,330

4,200

0.00011

9,090

On-site Network

Header 2

118,500

0.00021

4,760

4,200

0.00084

1,190

On-site Network

Header 3

21,100

0.00007

14,290

4,200

0.00027

3,700

*Return Period: Estimate of the interval of time between event occurrences.

July 2013
10.0-52

WesPac Pittsburg Energy Infrastructure Project


Recirculated Draft EIR

You might also like