SYSTEM AVAILABLITY SYSTEM 1. Flow 85 KLD --- -- 164 KLD --- New system Double of the existing system 2. Brine to Solar 10-12 KLD Solar pond --- <3 KLD Less than 3 Low Brine pond Present KLD to match disposal capacity 3 pond capacity KLD 3. RO pre-treatment Not Partial Unknown Pre-treatment Chemical Help in high implemented equipments system dosing + RO recovery available provided Precipitation of + Brine RO feed – 1,2 minimization &3 4. Filter and Media Wrong Filter Filters are Slackness Selection of To fill right filter Reduce the media available of Design right filter media turbidity.&SDI selection media 5. Micron filters Not consider Not available Slackness Consider and Fabricated new Reduce the of Design designed micron filters SDI 6. Anti-scalent Consider Pumps are Slackness Provided Install new Help to avoid system available but of O & M dosing pumps dehydration not working in membrane properly system 7. High pressure Consider Pumps are Not Designed for Install new pump available but suitable for higher capacity suitable High not suitable upgrade pressure for present flow pumps flow 8. Membrane Low Un suitable Slackness Consider as New elements High elements / area membrane membrane of the per standard install match membrane area. Not elements. design calculation the required area increase match the Not match the level the product standard required level flow. Reduce calculation. the reject Membranes flow. are in damaged condition 9. Feed transfer Not Available Slackness Consider for Install suitable pumps matching of the required flow new pumps. required flow design and head and head 10. Instrumentation Not effective Not available Slackness Minimum Install new Help to easy of the required instrumentation operate. design Instrumentation like PH, TDS, Minimize the consider flow meter. operator strain and O & M Cost. 11. RO Flushing No Not available Slackness RO Flushing Install new RO Avoid quick system of the system Flushing scaling. design designed system with pump and all accessories. 12. Centralized Not consider Not Available Slackness Consider Install new Help in monitoring of the centralized monitoring system design monitoring the plant system operation. Quick trouble shooting.