Teesta-III H.E.

P Rock Anchors for filling in over hang-Along the plane Data :Unit density of concrete Length of potential failure Periphery length Volume of filling Weight of of filling,W fy U T C A = = = = = = = = = = = = = Uplift Angle of potentail failure plane with horizontal Inclination of anchor with horizontal Anchorage force Angle of internal friction Cohesion in rock Area of block base 2.5 1.0 10.0 25.6 64 t/m3 m m cum t (Avg.) (Avg.)

500.00 N/mm2

Shear force which resist to sliding down the inclined plane. Resisting Force,(R.F) Driving force(D.F) Factor of saftey Equating 1 and 2 W Cos*tan T*sin(+)*tan T*cos(+) W sin Substuting in eq3 (33.9+2.14T)/(51.82-0.36T) = 1.0 = = = = = 34 2.1 2.1 T 0.36 0.36 T 52 t t = = = = = = {w* cos() + T*sin(+)}*tan()+C*A -U.. 1 {w* sin) - T*cos(+)}.. 2 1.0 54 15 42 (Neglecting cohesion and uplift) t t = R.F/D.F 3

T Tot. anchorage force per section

7.2 =

t 7.2 t

Assumed Rock anchors to be installed Assumimg rock anchors Assuming dia of bar to be Length of rock anchor = = = 1.0 32 4.0 m m c/c along the section

Check for material strength of rock anchor installed Permissible stress in anchor = = Capacity per anchor = 0.55 *fy 275 22.12 N/mm t
2

Bond strength between cement grout and rock anchor Allowable rock grout bond value Provide length of anchor Bond strength between cement grout and rock anchor Capacity per anchor Anchorage force per anchor Along the section Total No. of rock anchor Assuming of rock anchor to be fail Tot. anchorage force per meter Check for length of rock anchor Length of rock anchor fs,Factor of saftey d,dia of grout anchor hole = = = = Anchorage force per anchor L,Length of rock anchor = = = = = 0.5 3.5 N/mm m
2

(IS:10270)

= = = = =

**L*bd 25.00 22.12 9.00 9.00 50.0% 99.5 t Ok tonnes t Nos. Nos.

Check for anchorge force installed

T * fs * d * Cs
1 mm t/m2 t m Ok (IS:10270)

45.0 50 22.12 3

Cs = Allowable bond stress between grout & rock

plane From auto cad Area at section(From Autocad) A1 A2 Avg area = = 32.13 m2 19.11 m
2 2 25.62 m

Concrete fill Pt "D" 25.0 Rock Anchor W*cos W Pt "E" Potential failure plane 54.0 W*sin

an()+C*A -U.. 1

References - IS:456-2000 - IS:10270-1982 - IS:11309-1985

Shear force = *A = c + * tan Neglecting Cohesion = F/A Shear force =*tan *A F = W*COS Shear force = W*COS*tan