You are on page 1of 1

6096

TAPAK SURAU
(AKAN DI SERAHKAN KEPADA MAJLIS
AGAMA ISLAM PULAU PINANG (MAIPP)
DENGAN NAMAAN RM 1.00)
TAPAK
DEWAN
(AKAN DI SERAHKAN KEPADA MPPP
DENGAN NAMAAN RM 1.00)
BLOK C
LOJI
RAWATAN
KUMBAHAN
(AKAN DI SERAHKAN KEPADA INDAH
WATER KONSURTIUM
KOLAM
TADAHAN A
(AKAN DI SERAHKAN KEPADA JABATAN
PENGAIRAN DAN SALIRAN (JPS)
Dusun
Kawasan Belukar/Getah
Lorong Bukit Penara 1
Rumah
Rumah
18.319
18.296
18.052
18.194
18.258
18.185
18.530
18.814
18.793
18.521
18.997
18.803
18.570
18.707
18.691
18.772
18.715 18.684
18.538
18.730
18.978
19.760
20.358
20.478
20.755
21.848
19.816
19.275
22.674
21.524
24.041
26.018
30.629
30.373
27.619
29.969
30.324
24.065
25.815
29.150
20.144
23.740
22.495
19.946
19.481
19.065
20.208
21.329
28.118
23.641
27.163
27.017
24.959
21.300
25.015
28.098
22.712
27.288
21.086
23.264
20.216
19.597
18.990
19.399
19.363
19.239
18.756
18.961
19.246
19.550
19.421
17.346
18.855
19.095
17.148
18.868
18.770
17.643IL
40.949
41.333
51.783
49.694
47.904
53.748
58.340
59.474
62.406
63.964
66.652
69.023
69.403
69.395
72.538
75.611
77.013
79.464
79.304
71.007
72.200
76.092
79.092
85.953
87.277
78.179
81.232
86.239
92.849
92.456
105.366
106.108
103.929
105.726
104.767
100.972
104.384
103.418
101.003
101.032
98.191
94.261
91.362
83.768
81.946
75.900
73.058
70.244
67.162
74.500
74.191
65.592
67.184
67.717
56.523
57.210
58.395
43.298
44.529
44.197
43.672
756
381
383
384
2018
1554
1553
1552
1569
1565
1564
1563
1562
1561
1560
1559
1558
1557
1556
1555
3.721 ha.
56
197
196
195
194
190
254
LOT 57
Tanah Rata
1.776 ha.
1.945 ha.
Tanah Bukit
342
Kolam
Kolam
3
2
1
2468
2469
2466
2467
2464
2465
2462
2463
2477
2471
2470
18.713
18.350 18.325
18.296
16.950ILS
17.059IL
18.713
18.451
18.361
17.979
2479
TAMAN BALIK PULAU
CADANGAN TEMBOK PENAHAN KEPADA
BUTIRAN JURUTERA
KEHENDAK-KEHENDAK JABATAN BOMBA DAN
PENYELAMAT MALAYSIA
Pelan tapak:-
1. Adakan jalan akses perkakas bomba (access road) dengan kelebaran
tidak kurang 6 meter yang boleh menanggung beban 25 tan sepertimana
yang ditandakan didalam pelan.
2. Adakan ...buah pili bcmba jenis tiang pengeluaran dua hala dengan
pengeluaran air sebanyak 1135 liter seminit bagi setiap pili bomba
sepertimana yang ditandakan di dalam pelan.
3. Ketinggian kelegaan hendaklah tidak kurang daripada 5 meter.
4. Jarak antara bangunan hendaklah mematuhi jadual ke enam UKBS
1984.
5. Kecerunan jalan akses perkakas bomba hendaklah tidak kurang 1:12.
Ar. ABU HASSAN SALLEH
ARKITEK PROFESIONAL
No. pendaftaran LAM A / A 106
KEMUDAHAN ORANG KURANG UPAYA(O.K.U)
SEMUA KEMUDAHAN ORANG KURANG UPAYA DI SEDIAKAN DIDALAM BANGUNAN
ADALAH MENGIKUT GARISPANDUAN YANG TELAH DI TETAPKAN . BEBERAPA GARIS
PANDUAN YANG DI GUNAPAKAI UNTUK TERMASUKLAH:
i. MALAYSIAN STANDARD MS 1184: 2002 CODE OF PRACTICE ON ACCESS FOR
DISABLED PERSONS TO PUBLIC BUILDINGS (FIRST REVISION);
ii. MALAYSIAN STANDARD MS 1331: 2003 CODE OF PRACTICE FOR ACCESS OF
DISABLED PERSONS OUTSIDE BUILDINGS (FIRST REVISION); DAN
iii. MALAYSIAN STANDARD MS 1183: PART 8: 1990 SPECIFICATION FOR FIRE
PRECAUTIONS IN THE DESIGN AND CONSTRUCTION OF BUILDINGS PART 8: CODE
OF PRACTICE FOR MEANS OF ESCAPE FOR DISABLED PEOPLE
SIMPANAN JALAN 40',KEPADA BUTIRAN
JURUTERA DENGAN PENGESAHAN
JABATAN KERJA RAYA (JKR)
BLOK A DAN B
2 BLOK RUMAH PANGSA KOS RENDAH 15 TINGKAT
(370 UNIT) TERMASUK 5 TINGKAT PODIUM YANG
MENGANDUNGI TEMPAT LETAK KERETA ,1 TINGKAT
KEMUDAHAN MASYARAKAT DAN 1 TINGKAT TEMPAT
KERETA BAWAH TANAH (SUB BASEMENT),
PILI BOMBA DENGAN JARAK ANTARA SATU
SAMA LAIN ADALAH TIDAK MELEBIHI 91.5M
KEPADA KELULUSAN JABATAN BOMBA DAN
PENYELAMAT MALAYSIA
TAPAK DEWAN DENGAN KELUASAN 413.10
MP,AKAN DI SERAHKAN KEPADA MAJLIS
PERBANDARAN PULAU PINANG (MPPP)
DENGAN NAMAAN RM 1.00
TAPAK SURAU DENGAN KELUASAN 234.52
MP,AKAN DI SERAHKAN KEPADA MAJLIS
PERBANDARAN PULAU PINANG (MPPP)
DENGAN NAMAAN RM 1.00
LOJI RAWATAN KUMBAHAN ,SPESIFIKASI DAN
DIMENSI MERUJUK KEPADA BUTIRAN
JURUTERA AKAN DI SERAHKAN KEPADA
INDAH WATER KONSURTIUM
LOJI RAWATAN KUMBAHAN ,SPESIFIKASI DAN
DIMENSI MERUJUK KEPADA BUTIRAN
JURUTERA AKAN DI SERAHKAN KEPADA
INDAH WATER KONSURTIUM
SCALE 1:750
PELAN TAPAK
BLOK C
1 BLOK RUMAH PANGSA KOS RENDAH 16 TINGKAT
(156 UNIT) TERMASUK 5 TINGKAT PODIUM YANG
MENGANDUNGI TEMPAT LETAK KERETA ,1 TINGKAT
KEMUDAHAN MASYARAKAT DAN 1 TINGKAT TEMPAT
KERETA BAWAH TANAH (SUB BASEMENT),
KOLAM TADAHAN ,AKAN DISERAH KEPADA
JABATAN PENGAIRAN DAN SALIRAN (JPS)
255.18 MP
KOLAM
TADAHAN
B
126.92 MP
FINAL DISCHARGE KEPADA BUTIRAN
JURUTERA DENGAN PENGESAHAN JPS
CADANGAN SAMBUNGAN JALAN 50' AKAN DI
MAJUKAN DAN DI BINA OLEH PEMAJU LOT 56
MENGIKUT BUTIRAN JURUTERA DENGAN
PENGESAHAN JKR.

You might also like