Bar Bending Schedule OF Box Culvert

B = 2.00
Cover = 40 mm

H = 2.00

L = 7.50

7500

e g c j

H h

B i f

c L

Out side wall Bottom slab

Top slab

Part Top slab Top steel Bottom steel Distribution


Thickness T =

Bar mark

Shape Bar Dia of Bar

Space mm

Length of bars (m)

Row

Concret No. of e Length bars (mm)

Wt/ mtr Total of bars weight (Kg) (Kg)

1 a b j 250
mm

10 12 10

mm f @ mm f @ mm f @

140 130 200


2000

mm c/c mm c/c mm c/c mm

2.57 2.57 7.42

1 1 2

7.42 7.42 2.42


2500

53 57 24
mm

0.62 250 0.89 380 0.62 40

Clear Length

Total Length

Bottom slab Top steel

1 h i j 250
mm

10 10 10

mm f @ mm f @ mm f @

160 140 200


2000

mm c/c mm c/c mm c/c mm

2.57 2.57 7.42

1 1 2

7.42 7.42 2.42


2500

46 53 24
mm

0.62 220 0.62 250 0.62 40

Bottom steel Distribution


Thickness T =

Clear Length

Total Length

Out side wall

2
c d j 250 e f g
mm

Out side steel

10 10 10

mm f @ mm f @ mm f @

140 200 200


2000

mm c/c mm c/c mm c/c

2.57 2.57 7.42

2 2 4

7.42 7.42 2.42


2500

106 74 48
mm

0.62 490 0.62 340 0.62 80

In side steel Distribution


Thickness T =

Clear Height

mm
mm c/c mm c/c mm c/c

Total Height

Top Corner

10 8 8

mm f @ mm f @ mm f @

95 140 150

1.42 1.42 1.00

2 2 4

7.42 7.42 7.42

78 53 49

0.62 360 0.4 160 0.4 150

Bottom Corner 2 Hunch 4

Total steel Required 2760 Kg 2.76 Tons