Professional Documents
Culture Documents
Stressing Values and Stressing Record: Structure Al Ahsa Ring Road
Stressing Values and Stressing Record: Structure Al Ahsa Ring Road
MULTISTRAND TENDONS
Page 3
Structure
Section Plan No.
OVM. M15-12 1680 36 14 mm2 N/mm2 N/mm2 15 Part. prestress Full prestress 12 13
Jack type
Ram area "stressing" Ak Jack friction at (P) f Jack no. Gauge no. 16
Partial elongation required
Date of Stressing
459 cm2 3 % Owner's Representative 17 18
Strand protrusion At pressure (15) At pressure (14) Required (16)+(17) Actual Reduction elongation
Stressing Engineer
Struct. Element Pre-cast girder 28.15 m Stressing values established on 7/08 by S.S.A 1 2 3 4 5
Stressing End
8
Steel elongation within the jack
9
Elongation specified (5)+(6)+(7)+(8)
10
Addit. concrete shortening
11
19
20
Relieve
21
22
23
24
Elongation
25
Gauge pressure
Stressing sequence
Tendon Designation
Tendon Length
Tendon Elongation
Specified
Required (12)*(11)/(9)
At intermed stage
( 15 ) ( 14 ) ( 24 ) ( 15 )
mm
Slip
Actual
(22 )
( 23 ) (24 ) ( 24 )
* 100
mm 100.65 100.65
mm 1.0 1.0
mm
mm 5 5
mm 106.7 106.7
mm
mm 107 107
kN 2345 2345
kN
bar
mm
mm
mm
mm
mm
mm 106.7 106.7
C1
Left Right
28.16
C2
Left Right
28.21
195.50 195.50
1.0 1.0
5 5
201.5 201.5
202 202
2345 2345
525 525
201.5 201.5
C3
Left Right
28.24
195.00 195.00
1.0 1.0
5 5
201.0 201.0
201 201
2345 2345
525 525
201.0 201.0
Pressure & elongation must not be exceeded without permission of the consultant.