Checklist Title Note 27/1 27/1 27/1 27/1 27/1 27/1 27/1 27/1 19/2 19/2 19/2 19/2

1) Work Programme 2) Project Engineer CV 3) Project Supervisor CV 4) Method of Statements 5) Organization Chart 6) Refrigerant Pipe (with 1 set catalogue utk Maybank) 7) FCU & VRF Submission (catalogue 2 set; 1 PTSB, 1 Maybank) 8) Ducting Material (with 1 set catalogue utk Maybank) 9) Electrical Sub-Cont Profile 10) Cabling, Conduit, trunking & Cable tray (Catalogue 2 set; 1 PTSB, 1 Maybank) 11) Drain pipe (Catalogue 2 set; 1 PTSB, 1 Maybank) (PALING) 12) Jacketing Material (Catalogue 2 set; 1 PTSB, 1 Maybank) 13) Switchboard (Catalogue 2 set; 1 PTSB, 1 Maybank)(JACKIE) 14) Electrical Shop Drawings(XSMPT PROVIDE) 15) Remaining Shop Drawings(XSMPT PROVIDE) 16) BMS Shop Drawings(FOO) 17) Ventilation Fan (Catalogue 2 set; 1 PTSB, 1 Maybank) 18) Fire Seal c/w Bomba Approval (Catalogue 2 set; 1 PTSB, 1 Maybank)(
1. Workers name list 2. Workers sent to seat for Niosh course (

Mark

Book reservation on 6 March 2014

3. Progress according to every floor 4. Equipment list have to prepare at the site & sample board put at the site for client and consultant view. 5. Do checklist to check the sample and catalogue 6. Updated to May bank last issue the last meeting 7. Insurance expired date should be extended for another one month 8. Prepared second (2nd) submission to May bank 9. Submit the work program & progress chart in A3 paper.

You might also like