power requirements mining beneficiation port & material handling water pipeline 250 100
20 MW 5 MW 12 MW
pipeline
alt-1 is setting up benificiation at mining site alt-2 is setiing up benificiation at another location man power mines transport benificiation port administration
this requires water pipe line this requires double the ore to be mined alt -1 alt-2 390 1114 427 480 76 0 54 54 54 54 1001 1702
225 kms 30 million cub 1000 mm dia,thickness of 12 mm is capable of pumping uphill of 350 meters
e ore to be mined
southern part central part northern part total benificiated ore run of mine ore O.B southern OB. Central OB.northern BENIFICIATION water requirement total water
volume (million M3) 23.85 24.43 59.04 million ton million ton million ton million ton million ton
description drag line number of trucks required (40 ton) total number of shovels required(S) 4 M3 tractor dozer with ripper bulldozers crawler 410 HP bulldozers crawler 320 wheel mounted dozer 320 HP blast hole drills 150 mm dia blast hole drills 100 mm dia explosive truck motor grader 250 HP crane 5 tons crane 10 tons road roller 20 tons diesel trucks tractor lorries welding truck fuel truck ambulance van field vans jeep/car mechanical shop
quantity 2 7 3 1.0 2 2 2 1 1 1 2 1 1 2 2 3 2 3 1 2 3 1
price/uint 15000000 400000 920000 500000 400000 300000 250000 600000 500000 500000 250000 150000 200000 70000 40000 60000 40000 100000 20000 15000 10000 100000 total coast
area (sq.Km) 9.03 7.65 19.75 million M3 million M3 million M3 million M3 million M3
total price 30000000 2784699 2856636 497268 998907 749180 581512 795628 663024 500000 581512 150000 200000 105000 80000 180000 80000 300000 20000 30000 30000 100000 42283367
4 cub. Meter 0