Q-165 EXHAUST BAFFLE MANUFACTURING CHECKLIST

ASL Job#: SUPPLIER:

CLIENT: COMPONENT: DATE (y/m/d) CLOSED (y/m/d)

CHECKLIST ITEMS AND SUPPORTING DOCUMENTS REQUIRED 140 DIMENSIONAL INSPECTION AT FRAME FIT UP Jigs and templates approved by ASL (Q-163) Dimensions at fit up (Fabricator's record) Verfiy frame is square and flat (Fabricator's record) ASL Inspector sign off BAFFLE FRAME WELDING Weld map complete (Q300) (Check for contract requirements) Weld inspection (Fabricator's record) (Q-105) All sharp edges removed (Fabricator's record) (Q-105) All welds cleaned (Fabricator's record) (Q-105) ASL Inspector sign off PERF FACING ASSEMBLY FIRST SIDE Fit & weld perf facings with wire mesh (if specified on drawings), one side only (Q-105) Perf sheets installed burrs facing out ASL Inspector sign off

INSPECTOR

NR LOG

150

151

Q-165 Exhaust Baffle Manufacturing Checklist

Rev D

Page 1 of 2

Q-165 EXHAUST BAFFLE MANUFACTURING CHECKLIST

ASL Job#: SUPPLIER:

CLIENT: COMPONENT: DATE (y/m/d) CLOSED (y/m/d)

CHECKLIST ITEMS AND SUPPORTING DOCUMENTS REQUIRED 152 INSULATION & PERF FACING ASSEMBLY SECOND SIDE Correct type of insulation & retainer or pillow installed Insulation completely fills cavity, (no gaps or voids) Fit & weld perf facings with wire mesh (if specified on drawings), second side (Q-105) Perf sheets installed burrs facing out ASL Inspector sign off 230 FINAL INSPECTION Record dimensions after welding (Feature Verification Drawing) Baffle is clean and free of damage ASL Inspector sign off PACKAGING Packaging complete per contract requirements ASL Inspector sign off

INSPECTOR

NR LOG

240

NOTES: ASL forms referenced in this checklist may be replaced by the fabricator's own forms provided the fabricator's forms contain at least the same information as the current ASL forms. The ASL MQCP must be consulted for hold points by ASL and its customers.

Q-165 Exhaust Baffle Manufacturing Checklist

Rev D

Page 2 of 2