Professional Documents
Culture Documents
16
B (2)
16
16
36
I (20)
A (16)
2
C (5)
17
B (2)
12
7
F (5)
D (15)
25
25
25
30
45
H (20)
56
36
E (25)
25
30
30
J (5)
35
17
37
K (5)
G (20)
52
30
25
7
O (7)
35
L (5)
N (8)
35
30
10
7
P (3)
15
10
Q (5);
M (5);
(8)
30
20
R (10)
52
60
ID
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
Name
Begin date
Hanging and finishing drywall
9/24/09
Core drill for the rails
9/24/09
Installing rails (auditorium)
9/28/09
Carpeting at the seats
9/28/09
Wood panelling, trim and stage work 9/24/09
Carpeting at the rails
10/29/09
Painting
10/19/09
Installing seats (auditorium)
10/29/09
Installing seats (bowl)
10/16/09
Wood stage steps
9/28/09
Staining concrete floor
10/05/09
Installing carpet at steps, flats, aisles 10/05/09
Installing door and hardware
11/16/09
Constructing window
9/24/09
Waterproofing the terrace
9/24/09
Insulation
10/05/09
Completing concrete for the deck
10/08/09
Pouring stairs
10/22/09
Installing rails (terrace)
10/22/09
Completing masonry on the stairs
11/05/09