Professional Documents
Culture Documents
HSDPA Call Scenarios: Ralf Kreher, Tektronix MPT Berlin
HSDPA Call Scenarios: Ralf Kreher, Tektronix MPT Berlin
June 9, 2006
NBAP Cell Setup + Common Tr. Ch. Setup PCH, FACH, RACH
NBAP Shared Physical Channel Reconfiguration Request (c-ID=1, number-of-HS-PDSCH-codes = 5, hS-PDSCH-Start-code-number=2, HS-SCCH-Codes = 6/7/8) NBAP Shared Physical Channel Reconfiguration Response
June 9, 2006
June 9, 2006
RANAP
GTP-C
DPDCH (UL)
VPI/VCI/CID 2
TEID 1
IP
TEID 2
TEID 3
IP
TEID 4
HSPDSCH
VPI/VCI/CID 7
IP
Radio Bearer (IP) + SRBs (RRC)
Other UE sharing same HSPDSCH
4 June 9, 2006
Iu Bearer
NBAP Radio Link Setup Request (CRNC-CC, UL-SC=146xxxx, DCH-ID=1 and UL/DL TFS for SRBs, RL-ID=0, c-ID=1, DL-SC=0, DL-ChCd=96) NBAP Radio Link Setup Response (NodeBCC, DCH-ID + bindingID) ALCAP ERQ/ECF for DCCHs
FACH: RRC Connection Setup (TMSI, UL-SC=146xxxx, DCH-ID=1 and UL/DL TFS for SRBs, RB Mapping Option for SRBs UL/DL = DCH-1 or RACH/FACH, PSC, UL-SF=256, DL-SF/Cd-No.=256/96) 1st message on DCH: RRC Connection Setup Complete (UE Radio Access Capabilities) GPRS SM Service Request (P-TMSI) To SGSN
June 9, 2006
RRC Measurement Control (Meas.-ID=9, Setup Intra-Frequency Measurement, EventID = 1A, 1B, 1C) GPRS SM Activate PDP Context (max. Bitrate Ul/DL=64/384 kpbs) NBAP Synchr. Radio Link Reconfiguration Preparation Request (UL-SC=146xxxx, DCHs-toadd: DCH-ID=20 UL TFS= 4x336, DL TFS=0, RL-ID=0, DL-SC=0, DL-ChCd=97, HSDSCH-MAC-dFlow-ID=0, MAC-d-PDU-Size=336, RLCMode=RLC-AM, HSDSCH-RNTI=4369, HSDSCHRL-ID=0) NBAP Synchr. Radio Link Reconfiguration Preparation Response (DCH-ID + bindingID, HSDSCH-MAC-d-Flow-ID + bindingID) ALCAP ERQ/ECF for DTCH on DCH ALCAP ERQ/ECF for MAC-d Flow
To SGSN
June 9, 2006
RRC Radio Bearer Setup (H-RNTI=4369, rrcStateIndicator=cell-DCH, RAB-ID=5, RB-ID=6, RB Mapping Options UL/DL = DCH-20/DCH-20 orRACH/FACH or DCH-20/HSDSCH-0, UL-SC=146xxxx, UL-SF=16, HSSCCH-Codes = 6/7/8, CQI-RepetitionFactor=1, deltaCQI=5, PSC, DL-SC=0, DL-SF/Cd-No.=256/97) RRC Radio Bearer Setup Complete RRC Measurement Control (Meas.-ID=12, Setup TrafficVolumeMeas on UL TransportChannel RACH or CPCH, EventID = 4A) GPRS SM Activate PDP Context Accept (max. Bitrate Ul/DL=64/384 kpbs, PDP address=172.x.x.x) RRC Measurement Control (Meas.-ID=8, Setup Intra-Frequency Meas., EventID = 1D) FP HS-DSCH Capacity Request FP HS-DSCH Capacity Allocation (Priority, Credits, Interval) RLC Data (IP Payload) on DCH-20 RLC Data (IP Payload) on HSDSCH-0 (Uu) / MAC-d Flow = 0 (Iub) from SGSN
June 9, 2006
GPRS SM Deactivate PDP Context Request GPRS SM Deactivate PDP Context Accept NBAP Synchr. Radio Link Reconfiguration Preparation Request (UL-SC=146xxxx, DCHsDelete-List: DCH-ID=20, RL-ID=0, DL-SC=0, DLChCd=96, HSDSCH-MAC-d-Flows-to-delete: HSDSCH-MAC-d-Flows-ID=0) NBAP Synchr. Radio Link Reconfiguration Preparation Response (RL-ID=0) RRC Radio Bearer Release (RB-ID=6, UL/DL-DeleteTranspChList: DCH-20, HSDSCH-0, UL-SC=146xxxx, UL-SF=256, PSC, DL-SF/Cd-No.=256/96) RRC Radio Bearer Release Complete ALCAP REL/RLC for DTCH on DCH ALCAP REL/RLC for MAC-d Flow
June 9, 2006
RRC Measurement Control (Meas.-ID=12, Release) RRC Measurement Control (Meas.-ID=8, Release) RRC Connection Release RRC Connection Release Complete
NBAP Radio Link Deletion Request (NodeB-CC) NBAP Radio Link Deletion Response (CRNC-CC) ALCAP REL/RLC for DCCH
June 9, 2006