SOIL
BORING LOGS
A-1
This information
-Kingston
taken
Exploration
- Ash
Disposal
Area
Fossil
Plant Kingston
Tennessee
MACTEC
Engineering
May 4
2004.
TVA Kingston
Fossil
Platr
May 4
2004
MACTEC
Project
3043041009/0001
Soil
Test Boring
Hollow Stem
All
boring
borings
operations
were
conducted
in
general accordance
steel
with
ASTM D
auger
1.4-inch
1586.
The
by mechanically
intervals soil
turning continuous
hollow-stem
flights
into the
ground.
regular
samples
were obtained
first
with a standard
inches to
I.D.
2-inch
O.D.
and
split-tube
sampler. an
The
sampler
foot
was
seated
penetrate
any loose 30
inches.
cuttings
then driven of
is
additional
with blows of a
drive the
140-pound
the
final
hammer
foot
falling
The number
recorded and
the penetration foundations.
hammer
blows
the
required to standard an
sampler
was
of
designated
resistance
penetration
test
SPT
resistance.
provides
index
to
and
ability
to
support
Representative
portions
transported
of the
to
soil
samples
laboratory
obtained
for
from
the
split-tube further
sampler
were
sealed
in
glass
jars
and
our
testing
and
examination.
Test
Boring
Records
are
attached
graphically
showing the
soil descriptions
and
penetration
resistances.
Plugging
and Abandonment
of Boreholes
Upon completion
Portland
of drilling and
boreholes
were
plugged
with a Type
cement-bentonite accordance
after
in
general
with
requirements sampling
specified
by
TVA.
plugged
immediately
drilling
and
of the boreholes.
Bulk Samples
Bulk samples
of several
at
various elevations
were collected
for testing.
Undisturbed
Sampling
The
relatively steel
undisturbed tubing
into
soil
samples
soil
were
the
obtained
by pushing
level.
section
of
3-inch
O.D.
is
16-gauge
described
the
at
desired
sampling with
the
The
soils
sampling
procedure
by
ASTM
D-1587.
The
and
tube
together
to
encased
was
carefully
removed
made
airtight
transported
our laboratory.
TVA
Kingston
Fossil
Plant Ash
Disposal Area
May 4 2004
MACTEC To
was The
obtain
Project 304304100910001
relatively
undisturbed
samples
into
of ash a 3-1/2-inch
OD
3-inch
at the
lI?
split
spoon
with
liner
used.
The spoon
was pushed
in the
desired
ash
samples enclosed
to
liners
were then
sealed
with a and
wax
motor
content
oil
minimize
changes
in the structure
moisture
of the samples.
DE
SOIL CLASSIFICATION
L
E
AND REMARKS
SEE
E L
SAM PLES
1
PL %
x-couxT T Y
P E
?6
NMLL
f FINES
T H
G
E
E V ft
781 8
D
E
%
60 70 80 90 100
N D
N
T
?
?
10 20 30 40
SPT
50
bpf
NOTE
B-1.
WAS
EAST OF
AUGER BORING
FROM
PIPE
0.0
TO
20.0.
I
F-
PIEZOMETER
INSTALLED
20.0.
FROM GROUND
776
SURFACE TO A DEPTH OF
I-
10
771.8
15
7 66
15
?-
20
BORING
TERMINATED
AT
7618
20.0
20
25
25
-756.8-30
r-
30
751.8
35
746.8
-35
F-
40
741
-40
10 20 30 40 50 60 70 80 90 100
45
7u
REMARKS
PROJECT
DRILLED
PROJ.
TH1S RECORD IS A REASONABLE INTERPRETATION OF SUBSURFACE CONDfl7ONS AT THE EXPLORATION LOCATION. SUBSURFACE CONDIl7ONS AT OTNER LOCATIONS AND AT OTHER TIMES MAY DIFFER INTERFACES BEWEEN STRATA ARE APPROXIMATE. TRANSI77ONS BE1WE.EN STRATA MAY BE GRADUAL Ddller Prepared Checked Akins ByJustice
March 25 2004
3043041009/0001
NO.
OF
By
I MACTEC
SOIL CLASSIFICATION
EP
E
E
SAM PLES
N COIJNT
D
E
Jq
PL
io f
NM io
FINES SPT
AND REMARKS
SEE
?
50
zI.
0/0
T H
G E
V
ft
795 3
T Y
P E
%
60
KEY SYMBOL SHEET FOR EXPLANATION OF BELOW. SYMBOLS AND ABBREVIATIONS WELL APPROXIMATELY
2
N
D
o N
10 20 30 40
bpf
70
80 90 100
NOTE MONITORING
INSTALLED
B-2.
AUGER
BORING
FROM
0.0
TO
35.0.
FROM GROUND
790.3 5
10
I10
-785.3-15
I15
780.3
F-
20
-775
3-20
3 25 30 35 40
h-
25
770
f-
30
3--765
F-
35
BORING
TERMINATED
AT
3--760
35.0
F-
40
755.3
750.3
en
en
nn
SOIIr REMARKS
PROJECT DRILLED
PROJ.
TMS RECORD
SUBSURFACE LOCATION. LOCATIONS INTERFACES TRANSITiONS
IS A REASONABLE INTERPR67ATION OF CONDflONS AT THE EXPLORATION SUBSURFACE CONDI7lONS AT OTHER AND AT OTHER TA4ES MAY DIFFER ARE APPROXIMATE BEWEEN STRATA MAY BE GRADUAL BE7WEEN STRATA
March 25 2004
3043041009/0001
NO.
OF
Driller
Akins ByJustice
Prepared Checked
f MACTEC
By
SOIL CLASSIFICATION
E
L E
SAM PLES
N COUNT D
E
PL
AND REMARKS
SEE
2o
A
NM
%
10
bpf
60 70
LL
G
E
T Y
P
F1NE5 SPT
KEY SYMBOL SHEET FOR EXPLANATION OF SYMBOLS AND ABBREVIATIONS BELOW. WELL 3 PIEZOMETER APPROXIMATELY 16.0 SOUTH
N D
B
8I0
8
N
T
9o
r .
10 20 30 40
50
80
90
100
NOTE MONITORING
INSTALLED
B-3.
WAS
WEST OF
AUGER BORING
FROM
PIPE
0.0
TO
40.0.
i PIEZOMETER
5
INSTALLED
40
FROM GROUND
805.8 5
SURFACE
TO A DEPTH OF
10
800.8
10
-ti
f-
15
795.8
-15
8
20
790
20
785
25
10
F-
1
780.8 30
30
775.8
35
BORING
TERMINATED
AT
7708
40.0
40
765
---
--
--
--
-__
10
REMARKS
RECO
Diposal
PROJECT
DRILLED
PROJ.
RECORD IS A REASONABLE INTERPRETATION OF SUBSURFACE CONDRIONS AT THE EXPLORATION LOCATION. SUBSURFACE CONDrrtONS AT OTIMB LOCATIONS AND AT OTHER TIMES MAY DIFFER. INTERFACES BEWEEN STRATA ARE APPROXIMATE. TRANSITIONS BETWEEN STRATA MAY BE GRADUAL
THIS
Ash
Area
March 25 2004
NO.
3043041009/0001
OF
Driller
Akins ByJustice
Prepared Checked
f MACTEC
By
SEE
TO STIFF ORANGE-BROWN SLIGHTLY MOIST S1LTY CLAY WITH CHERT FRAGMENTS FILL VERY STIFF GRAY DRY TO SLIGHTLY MOIST SANDY CLAYEY SILT ASH
FIRM
-
-SYMBOLS
SOIL CLASSIFICATION
L
AND REMARKS
SHEET
E E
E L
S AMPLES N COUNT Y
PL
%
20
NM
LL
D
E T
FINES SPT
KEY SYMBOL
FOR EXPLANATION OF
BELOW.
N
D
bpf
AND
ABBREVIATIONS
ft
ry
7818
10
30
40
50
60
70
80
90
100
SPT-I
3-7-11
VERY DENSE TO VERY LOOSE GRAY SCIOHTLY ASH MOIST TO WET SILTY SAND
-
UD
776.8
0.5-0.5
5 SPT-2 15-25-26
10
NOTE AT ABOUT 15.0 STARTED INrRODUCING WATER INTO THE BOREHOLE TO REDUCE PIPTNG SUBSURFACE MATERIALS INTO AUGERS.
766.8
15
OF
SPT4
2-1-1
761.8
20 SPT-5 woh-woh-1
25
756.8-SPT-6
1-2-3
30
751.8-SPT-7
woh-woh-I
35
746.8-SPT-8
woh-woh-1
40
SILTY
CLAY
ASH
7z4 0
10
20
30
40
50
60
70
80
90
100
REMARKS
PROJECT DRILLED
PROJ.
THiS
TVA
March
Kingston Ash
2004
B-1
NO.
3043041009/0001
OF
RECORD
A REASONABLE INTERPRETATION OF IS CONDITIONS AT THE EXPLORATION SUBSURFACE CONDrlIONS AT OTHER AND AT OTHER TIMES MAY DIFFER. BEWEEN STRATA ARE APPROXIMATE. BETWEEN STRATA MAY BE GRADUAL
Driller
Akins ByJustice
Prepared Checked
fil
MACTEC
i
By
SOIL CLASSIFICATION
E v ft
736 8
S D
E
1j
AM PLES
N-COUNT Y
P
zo
PL
%
A
20 30
NM ?a
FINES SPT
LL
?e
AND REMARKS
SEE
%
60 70 80 90 100
KEY SYMBOL SHEET FOR EXPLANATION OF BELOW. SYMBOLS AND ABBREVIATIONS TO VERY SOFT GRAY WET SANDY SILTY CLAY ASH
-
N D
. 6
o
72
bpf
10
40
50
FIRM
SILT
/
CLAYEY
SPT-10
1-2-3
F-
50
731.8-50
SPT-11 woh-1-1
SILTY
55
55
F-
60
60
SAND
F-
ALLUVIUM
716.8
65
65
UD-2
2.0-2.0
SPT-14
2-2-2
r-
70
70
N
I-
75
706.8 SPT-16
5-6-8
75
F-
80
IN
SAMPLE INTERVAL
7018
SPT-17
5-6-6
TO
81.5
AUGER REFUSAL
82.2.
AT
82.2.
BORING
TERMiNATED
AT
I-
85
696.8
85
SO
1-
90
10
REMARKS
PROJECT DRILLED
PROJ. NO.
THIS RECORD IS A REASONABLE IATERPRETATION SUBSURFACE CONDfr7ONS AT THE EXPLORATION AT OTHER LOCATION SUBSURFACE CONDITIONS LOCATIONS AND AT OTHER T1MES MAY DtFFER. lNTERFACES BEWEEN STRATA ARE APPROXIMATE. TRANSITIONS BETWEEN STRATA NIAY BE GRADUAL. OF
Driller
TVA
Kingston Ash
March
2004
B-1
3043041009/0001
OF
Akins ByJustice
Prepared Checked
By
0 MACTEC
A
SOIL CLASSIFICATION
L E
AND REMARKS
SEE
E L
SAMPLES
I
PL
N COUNT
T
%
A
20 30 40
NM
%
bpf
60 70
LL
%
90 100
G E
V
ft
78
1.8
g N T
Y
P
N
D
eto ? ? r ?
NOTE
SOUTH
APPROXIMATELY
22.0
-10
FINES 0/6 SPT
50 80
AUGER BORING FROM 0.0 TO 5.0 USED FOR HYDRAULIC CONDUCTIVITY TESTING.
IN-SITU
F-
BORING TERMINATED
AT
7768
5.0
F-
10
77
1.
10
15
766.8
15
F-20
761.8
20
I-
25
25
F-
30
-756.8-30 -751.8-35
746.8 741.8 40
F-
35
F-
40
L- 45
7u
10
20
30
40
50
60
70
80
90
100
REMARKS
PROJECT DRILLED
PROJ.
TMS RECORD
SUBSURFACE LOCATION LOCATIONS INTERFACES TRANSITIONS
IS A REASONABLE INTERPRETATION OF CONDITIONS AT THE EXPLORATION AT OTHER SUBSURFACE CONDITIONS AND AT OTHER TIMES MAY DIFFER. BEWEEN STRATA ARE APPROXIMATE. BETWEEN STRATA MAY BE GRADUAL Driller
TVA
March
Kingston Ash
15 2004
B-IA
NO.
3043041009/0001
OF
Akins ByJustice
Prepared Checked
By
I MACTEC