PJA VILLA-1803 con

PROJECT:

PALM JEBEL ALI VILLAS -1804 MED_FIRST FLOOR


Check Punching shear for interior column
Pu =

1490 KN

fc' =

42 MPa

L Colum =

1500 mm

B Colum =

250 mm

Steel DIA

16 mm

t (mm)=

280 mm

d=

239 mm

bo= ((L+d)+(B+d))2
=

4456.00 mm

1564.43 KN

ACI - EQ. (11-33)

6
0.17(1+2/)(fc')bod

Vc =
=

40

Vc =

0.083(Sd/bo+2)fc'bod

2374.73 KN

ACI - EQ. (11-34)

Vc =

0.333fc'bod

2277.62 KN

ACI - EQ. (11-35)

Vc =

1564.43 KN

from Equ (a), (b ) and,

0.75Vc=

1173.32

KN

Pu>Vc ; NG : Shear reinforcement is required

Check Punching shear for Edge column


Case of column long dirction is Parallel to the edge
Pu =

365 KN

fc' =

42 MPa

L Colum =

1500 mm

B Colum =

250 mm

Steel DIA

12 mm

t (mm)=

280 mm

d =
bo =

243 mm
((L+d)+(B+d/2)2)

2486.00 mm

887.40 KN

ACI - EQ. (11-33)

6
0.17(1+2/)(fc')bod

Vc =
=

30

Vc =

0.083(Sd/bo+2)fc'bod

1602.77 KN

ACI - EQ. (11-33)

Vc =

0.333fc'bod

1291.95 KN

ACI - EQ. (11-33)

Vc =

887.40 KN

from Equ (a), (b ) and

0.75Vc=

665.55

KN

Pu<Vc ; OK

Check Punching shear for Corner column


Pu =

163 KN

fc' =
L Colum =

1500 mm

B Colum =

250 mm

Steel DIA

12 mm

t (mm)=

280 mm

d =
bo =

42 MPa

243 mm
((L+d/2)+(B+d/2))

1993.00 mm

711.42 KN

ACI - EQ. (11-33)

6
0.17(1+2/)(fc')bod

Vc =
=

20

Vc =

0.083(Sd/bo+2)fc'bod

1156.26 KN

ACI - EQ. (11-33)

Vc =

0.333fc'bod

1035.74 KN

ACI - EQ. (11-33)

Vc =

711.42 KN

from Equ (a), (b ) and

0.75Vc=

533.56

KN

Pu<Vc ; OK

Project

Project Number

Sheet No.

Antara Dehradun

1443

Client

Prepared by

Checked by

TDIC

KG

Design Element

Date

Result
3/19/2014

Block 7A-First Floor Slab

CALCULATIONS

Check Punching shear as per IS 456:2000 code


Case 1
Vu =

35 MPa

fy =

500 MPa

L Colum =

350 mm

B Colum =

800 mm

Steel DIA

16 mm

t (mm)=

600 mm

d=

525 mm

Slab Edge Case =


bo=

4998 KN

fck =

Case 3

L
B
L

4
((L+d)+(B+d))2

4400 mm

Case 2

Case 4

c = 2.2857143
v =

Pu/bod

2.16 N/mm2

ks =

(0.5+c)

1.00

c =

0.25fck

1.48 N/mm2

ks* c

1.48 N/mm2

ksc =

(IS 456:2000 - Clause 31.6.21)

(IS 456:2000 - Clause 31.6.3)

L
B
L

Provide Shear Rft.

Vs =

(Vu-0.5kscbod)

3290 KN

Av =

Vs/0.87fy

7563 mm^2

Project

Project Number
Al Bateen Wharf Phase-2

1441

Client

Prepared by
TDIC

Date

CALCULATIONS

RESULT

Column at Grid W29-WT


Check Punching shear for interior column as per ACI 318M-08

=
Vc =

2
0.17(1+2/)(fc')bod

3372 mm

1717.37 KN

ACI - EQ. (11-33)

=
40
0.083(Sd/bo+2)fc'bod
Vc =
=

2046.97 KN

ACI - EQ. (11-34)

1666.86 KN

ACI - EQ. (11-35)

0.333fc'bod
Vc =
from Equ (a), (b ) and,

=
Vc =

0.75Vc =

1250.15

KN

Date

3/19/2014

Block 7A-First Floor Slab

Pu =
825 KN
fc' =
38 MPa
fy =
420 MPa
=
0.75
L Colum =
800 mm
B Colum =
400 mm
Steel DIA
12 mm
t (mm)=
280 mm
d=
243 mm
bo= ((L+d)+(B+d))2

Checked by

KG

Design Element

REFERENCE

Sheet No.

1666.86 KN
Pu<Vc ; OK

Project

Project Number
1441
Prepared by
KG
Date
3/19/2014

Al Bateen Wharf Phase-2


Client
TDIC
Design Element
Block 7A-First Floor Slab

REFERENCE

CALCULATIONS

Check Punching shear for Corner column


Pu =

245 KN
36 MPa

fy =

460 MPa

0.75

L Colum =

800 mm

B Colum =

400 mm

Steel DIA

12 mm

t (mm)=

300 mm

d=

263 mm

bo= ((L+d/2)+(B+d/2))
=
Vc =

1463 mm

2
0.17(1+2/)(fc')bod

784.93 KN

ACI - EQ. (11-33)

20

Vc =

0.083(Sd/bo+2)fc'bod

1072.15 KN

ACI - EQ. (11-34)

Vc =

0.333fc'bod

761.84 KN

ACI - EQ. (11-35)

Vc =

761.84 KN

from Equ (a), (b ) and,

0.75Vc =

571.38 KN

Pu<Vc ; OK

from Equ (a), (b ) and,


Vc =
0.75Vc =

571.38

KN

761.84 KN
Pu<Vc ; OK

Checked by
Date

RESULT

Column at Grid W29-WT

fc' =