Is Punching Check
Is Punching Check
PROJECT:
1490 KN
fc' =
42 MPa
L Colum =
1500 mm
B Colum =
250 mm
Steel DIA
16 mm
t (mm)=
280 mm
d=
239 mm
bo= ((L+d)+(B+d))2
=
4456.00 mm
1564.43 KN
6
0.17(1+2/)(fc')bod
Vc =
=
40
Vc =
0.083(Sd/bo+2)fc'bod
2374.73 KN
Vc =
0.333fc'bod
2277.62 KN
Vc =
1564.43 KN
0.75Vc=
1173.32
KN
365 KN
fc' =
42 MPa
L Colum =
1500 mm
B Colum =
250 mm
Steel DIA
12 mm
t (mm)=
280 mm
d =
bo =
243 mm
((L+d)+(B+d/2)2)
2486.00 mm
887.40 KN
6
0.17(1+2/)(fc')bod
Vc =
=
30
Vc =
0.083(Sd/bo+2)fc'bod
1602.77 KN
Vc =
0.333fc'bod
1291.95 KN
Vc =
887.40 KN
0.75Vc=
665.55
KN
Pu<Vc ; OK
163 KN
fc' =
L Colum =
1500 mm
B Colum =
250 mm
Steel DIA
12 mm
t (mm)=
280 mm
d =
bo =
42 MPa
243 mm
((L+d/2)+(B+d/2))
1993.00 mm
711.42 KN
6
0.17(1+2/)(fc')bod
Vc =
=
20
Vc =
0.083(Sd/bo+2)fc'bod
1156.26 KN
Vc =
0.333fc'bod
1035.74 KN
Vc =
711.42 KN
0.75Vc=
533.56
KN
Pu<Vc ; OK
Project
Project Number
Sheet No.
Antara Dehradun
1443
Client
Prepared by
Checked by
TDIC
KG
Design Element
Date
Result
3/19/2014
CALCULATIONS
35 MPa
fy =
500 MPa
L Colum =
350 mm
B Colum =
800 mm
Steel DIA
16 mm
t (mm)=
600 mm
d=
525 mm
4998 KN
fck =
Case 3
L
B
L
4
((L+d)+(B+d))2
4400 mm
Case 2
Case 4
c = 2.2857143
v =
Pu/bod
2.16 N/mm2
ks =
(0.5+c)
1.00
c =
0.25fck
1.48 N/mm2
ks* c
1.48 N/mm2
ksc =
L
B
L
Vs =
(Vu-0.5kscbod)
3290 KN
Av =
Vs/0.87fy
7563 mm^2
Project
Project Number
Al Bateen Wharf Phase-2
1441
Client
Prepared by
TDIC
Date
CALCULATIONS
RESULT
=
Vc =
2
0.17(1+2/)(fc')bod
3372 mm
1717.37 KN
=
40
0.083(Sd/bo+2)fc'bod
Vc =
=
2046.97 KN
1666.86 KN
0.333fc'bod
Vc =
from Equ (a), (b ) and,
=
Vc =
0.75Vc =
1250.15
KN
Date
3/19/2014
Pu =
825 KN
fc' =
38 MPa
fy =
420 MPa
=
0.75
L Colum =
800 mm
B Colum =
400 mm
Steel DIA
12 mm
t (mm)=
280 mm
d=
243 mm
bo= ((L+d)+(B+d))2
Checked by
KG
Design Element
REFERENCE
Sheet No.
1666.86 KN
Pu<Vc ; OK
Project
Project Number
1441
Prepared by
KG
Date
3/19/2014
REFERENCE
CALCULATIONS
245 KN
36 MPa
fy =
460 MPa
0.75
L Colum =
800 mm
B Colum =
400 mm
Steel DIA
12 mm
t (mm)=
300 mm
d=
263 mm
bo= ((L+d/2)+(B+d/2))
=
Vc =
1463 mm
2
0.17(1+2/)(fc')bod
784.93 KN
20
Vc =
0.083(Sd/bo+2)fc'bod
1072.15 KN
Vc =
0.333fc'bod
761.84 KN
Vc =
761.84 KN
0.75Vc =
571.38 KN
Pu<Vc ; OK
571.38
KN
761.84 KN
Pu<Vc ; OK
Checked by
Date
RESULT
fc' =
Sheet No.