Professional Documents
Culture Documents
2013 09 17 Krauklis Lat Vecmajas
2013 09 17 Krauklis Lat Vecmajas
1. stva plns
2. stva plns
Griezums
Photo or Drawing
2012 1 619,0
3,3
20,0 2,1
C W/m2
Treated floor area Space heating Annual heating demand Heating load Space cooling Overall specific space cooling demand Cooling load Frequency of overheating (> 25 C) Primary Energy
Space heating and cooling, dehumidification, household electricity. DHW, Auxiliary
116,5
Fulfilled?*
26 26
kWh/(m2a) W/m
2
no no yes -
120 kWh/(ma)
-
103
50
DHW, space heating and auxiliary electricity Specific primary energy reduction through solar electricity
PHPP aprins
Airtightness
0,4
1/h
PHPP aprins
Projekta autori: Arhitekti Ervins Krauklis, Mikus Grende Bvinenieris Anrijs Rudzis Ventilcijas sistma: stud.in. Kristaps Safranovs
Paldies!
WWW.PASSIV.LV ERVINS.KRAUKLIS@GMAIL.COM