In FATA ADP 2013-14 three schemes were reflected for SWA regarding Communication Sector. Details of these schemes are as under:SI NO. 1 Cost in ADP 2013-14 98.208 (M) 114.580 (M)

ADP NO. 651/130024

Name of Scheme Construction of Black Topped Roads in SWA Construction, Rehabilitation, Widening and Improvement of Roads in Wana Sub Division and Sarwakai Sub Division SWA Construction, Rehabilitation, Widening and Improvement of Roads in Ladha Sub Division SWA

652/130025

653/130032

114.576 (M)

Against ADP 651/130024 the Political Administration identified 7 components, 2 of the components for closed area, of total length 8 km vide letter no Against ADP 652/130025 the Political Administration identified 12 components vide letter no.. Out of these 12 components, 6 are rehabilitation and 6 are construction. Similarly, 10 components of which 6 are rehabilitation and 4 are construction were identified by Political Administration against ADP 653/130032 vide letter no. The W & S Department framed PCI/DCE for the above mentioned schemes and submitted it to the competent authority for further proceedings. The Pre-FDWP meeting was held on 26/03/2014 and observations were raised by the P&D Departments. The W&S Department submitted satisfactory replies and now the schemes are included in the agenda of FDWP meeting which is to be held on 03/04/2014.

You might also like