You are on page 1of 1

SUPPLY CHARACTERISTICS AND EARTHING ARRANGEMENTS

Earthing arrangements

TN-C
TN-S

Number and Type of Live


Conductors
a.c.

TN-C-S
TT

Nature of Supply Parameters

Type: LVCB
Nominal frequency, f () 50.12 Hz

2-pole

2-phase, 3-wire

3-pole

3-phase, 3-wire

other

Supply
Protective Device
Characteristics

Nominal voltage, U/Uo () 1400.15 V

d.c

1-phase, 2-wire

Tick boxes and enter details, as appropriate

Prospective fault current, Ipf (2) 0.001 kA

Rated
Current 123.23 A

External loop impedance, Ze (2) 10.13


(Note: (1) by enquiry, (2) by enquiry or by measurement)

IT

3-phase, 4-wire
PARTICULARS OF INSTALLATION REFERRED TO IN THE CERTIFICATE Tick boxes and enter details, as appropriate
Means of Earthing
Details of Installation Earth Electrode (where applicable)
Type
Location
Electrode resistance
Distributor's facility
(e.g. rod(s), tape etc)
to Earth
Installation
earth electrode

....................

105.23

Main Protective Conductors


Earthing conductor:

material..............................

csa ..

Main protective bonding


conductors

material .

csa...

To incoming water service


To lightning protection

To incoming gas service


To incoming oil service
To structural steel
To other incoming service(s)
(state details......................................................)
Main Switch or Circuit-breaker
BS, Type and No. of poles ..
Current rating 15.32 A
Voltage rating 1500.54 V
Location

Fuse rating or setting 12.12 A

Rated residual operating current In = 13.14 mA, and operating time of 500 ms (at In) (applicable only where an RCD is suitable and used as a main circuit breaker)
Recommendations as
OBSERVATIONS AND RECOMMENDATIONS Tick boxes and enter details, as appropriate
detailed below

Referring to the attached Schedule(s) of Inspections and Test Results, and subject to the limitations specified
at the Extent and Limitations of the Inspection section
No remedial work is required
The following observations are made:
.

One of the following numbers, as appropriate, is to be allocated to each of the observations made above to indicate to the person(s)
responsible for the installation the action recommended.
1

requires urgent attention

requires improvement

requires further investigation

does not comply with BS 7671:2008 amended to ............. This does not imply that the electrical installation inspected is
unsafe.
SUMMARY OF THE INSPECTION
4

Date(s) of the inspection: ....................................................................................................................................................................


General condition of the installation: ...................................................................................................................................................
.............................................................................................................................................................................................................
.............................................................................................................................................................................................................
.............................................................................................................................................................................................................
Overall assessment: Satisfactory/Unsatisfactory
SCHEDULES
The attached Schedules are part of this document and this Certificate is valid only when they are attached to it.
............ Schedules of inspections and . Schedules of Test Results are attached.
(Enter quantities of schedules attached)

You might also like