TES-P-105
Revision no.0
PRECOMMISSIONING TESTS/PROCEDURES
FOR SEC TRANSMISSION ELECTRICAL.
INSTALLATIONS.
ee
Fes aaa aa]
|
Tene ath abso
ial
|
EXOT Romig fa Pele TRANSMISSION
a gon 30
Scene near, PRE-COMMISSIONING TEST PROCEDURE
PRE-COMMISSIONING TEST | Heonmissonng Contes
PROCEDURES FOR SEC
‘TRANSMISSION
SLECTICAL MSTALLASINS
4.0 INTRODUCTION
Proper precanmiaseing of new eaal aqiment is inportant lo prove threw equipment hae
‘tor pope supped ane cerecy erecnd sna mato The Procedure Mghghs te Moceaay ops
‘atl b pope” ecommissonng sew sect! eaaeran
‘severe practi equgmene etn he actor baore diver teste, Precammissening
No equpmant wos sued oan ar
[Alequpment as teen sald recy.
‘Atecupment warn n cordon wih te aqupmant soe
‘i gotten od cn cere a wkng arr wah lant nese and
+ Atetupment ns een agusis propery in sccorance win appre stings.
1 Theisaaton i aoe puiog mo sens
rng vanspratn,
‘remain purpose ti roadie
1.14 To pode puidines ote wiestng engine o techniian to epnize wor
{Este dea eprecommissonng ts pores
1.12, Telponge Be minimum lest to be portaned cn te eqipent by te
adr who has prepares work acorng io hs rca,
‘his Procedure ia ded to to pts: he et part castes raring the waka te blo,
‘heg a aar re-commiesone es
‘Te seam part concoms the mechanical checks, inspeciors and clot! tats o be
Deed en equpmen bet crmssoning he equates
PARE ORGANZATION OF THE WORK SITE FOR PRE:-COMMISSIONNGTRANSMISSION
spe ag 2
Sete company PRE-COMMISSIONING TEST PROCEDURE
Ti ae a
"Fon-1000.80 eo
aera ‘aa Oe
PRE-COMMISSIONING TEST | Pe-Commsoning Commitee 2086 7
PROCEDURES FoR sec ["™™
“TRANSMISSION can
ELECTRICAL INSTALLATIONS | Mobanmed Al Rate
open
TY’AtHamoudl, Vie President CTA
149 INTRODUCTION
Proper pre-commisioning of new electrical equipment is important to prove thet new equipment hes
been propa shipped and caecty erected anginsales. The Procedure ght the neces steps
Feltesto proper pe commissioning of nem soci eqaomert
‘hs wonea practice easpmert testi te factory before dalivery tothe ate. Presommieioning
texting at ates cone prove hat
No omupment was stjecte to any damage tring Wansportton.
‘Aecuipmert has boon ataled corey.
‘Allequpmert is woking i coeriaton wth oer equipment. as species
Alle protection and coil schemes are working in acordance wh relevant specications and
protecton eure
‘Aecuipmort hes boon adustd proper in accoctance wth approved setngs,
+ ‘Theistaaton seo for puting into seres
1 Purpose
“The main pote ofthis procedures
1.44 To prove quienes tote wenessing engineer or technician o organize work
st te aurng he pre sommisening ot prea
1412 To prowde the minimum less be perlrmed on the equoment by the
‘conacor, who has to prepare is work coring tothe Procedure
“This Procedure is died oto part: the fa part deserbes organizing the work at ste bao,
ing onder procommissning tote.
‘The socond part concerns the mechanic checks, ingpectont and eloctial tots to be
_ertormed on he equpment bere commissioning ine equpett io saree
PARTI ORGANIZATION OF THE WORK SITE FOR PRE-COMMISSIONING
PARTI, MECHANICAL TESTS, VISUAL INSPECTIONS AND ELECTRICAL TESTS