Professional Documents
Culture Documents
Process
Summary of My Process Experience
Simulation Programs
ASPEN HYSYS (Exchanger heating curves) PRO/II (Compressor duty, CW mass flow)
Process Documents
Process Flow Diagrams (PFDs) P&IDs Utility Summaries Equipment Lists Equipment Data Sheets Material Selection Report (MSR)
Calculations
Cooling Water System Design Pump Hydraulics Line Sizing
Simulation Programs
Aspen Hysys Heat Exchanger Sizing Aspen Properties
Process Documents
Revision of Process Flow Diagrams (PFDs) Revision of P&IDs Preparation of Equipment Lists Preparation of Material Selection Report
Calculations
Cooling Water System Design
Cooling Water Requirement for Each Equipment Line Sizing using Fathom Pump Hydraulics
Calculations (contd.)
HSE
Summary of My HSE Experience:
Plot Plan Review for Refinery and Petrochemical Facilities Deluge System Design for Pressure Vessels Fire Fighting (FF) Equipment identification and allocation FF Equipment bid evaluation Implementation of Guidelines & Industry Practices such as NFPA 30, NFPA 58, API 2510, & PIP
THANK YOU