Intern presentation

Process & HSE Internship Experience


Ram K Sharma Texas A&M University Chemical Engineering, Class of 2014

Process
Summary of My Process Experience

Simulation Programs
ASPEN HYSYS (Exchanger heating curves) PRO/II (Compressor duty, CW mass flow)

Process Documents
Process Flow Diagrams (PFDs) P&IDs Utility Summaries Equipment Lists Equipment Data Sheets Material Selection Report (MSR)

Calculations
Cooling Water System Design Pump Hydraulics Line Sizing

Simulation Programs
Aspen Hysys Heat Exchanger Sizing Aspen Properties

Pro/II Sour Gas Treating Stream Summary

Process Documents
Revision of Process Flow Diagrams (PFDs) Revision of P&IDs Preparation of Equipment Lists Preparation of Material Selection Report

Calculations
Cooling Water System Design
Cooling Water Requirement for Each Equipment Line Sizing using Fathom Pump Hydraulics

Calculations (contd.)

HSE
Summary of My HSE Experience:
Plot Plan Review for Refinery and Petrochemical Facilities Deluge System Design for Pressure Vessels Fire Fighting (FF) Equipment identification and allocation FF Equipment bid evaluation Implementation of Guidelines & Industry Practices such as NFPA 30, NFPA 58, API 2510, & PIP

New Software/Programs Experience:


PIPENET Vision ; Fathom; Phast

Plot Plan Review


Conduct a safety evaluation of the plan
Verify the distances between equipment and buildings based on SKEC USA HEXP-201 Arrange facilities and equipment in a way that minimizes damages in the event of fire and explosion

Plot Plan Review (contd.)

Fire Protection Equipment Requirement


Evaluate the necessity of Fire Protection Equipment Calculate the number of Equipment

Sprinkler Fire System


Deluge System sizing

THANK YOU