Alarm RF unit VSWR SHG <> 5066 BP TRX H.W critical NEC down man NEC down man NEC down man door RF unit VSWR+ RF unit maintanance link RF unit RX Input main lake of phase A/C1 and A/C2 Battery not in position UL path imbalance in sector 2
932 5066 5687 5059 5057 5055 2444 932 5908 5672 5056 1760 5065
B.L 17/3/2014 21/3/2014 25/3/2014 25/3/2014 25/3/2014 25/3/2014 25/3/2014 25/3/2014 25/3/2014 25/3/2014 25/3/2014 25/3/2014
Alarm clearance time still still still 25/3/2014 25/3/2014 25/3/2014 25/3/2014 25/3/2014 25/3/2014 still 25/3/2014 still still
configure NEC configure NEC configure NEC check sensor change feeder need PSU check power sending alarm need to transfer 3G to a good battery of 2G
Access TE