Date:02/09/2013
From:GuangzhouLushanNewMaterialsCo.,Ltd.
To: DATASTEELPIPESINDUSTRIES(PVT)LTD
Re:TestArrangementofLushanCopolymeradhesiveL-SRandHDPEEJ-1
I,Be sure that the package ofthe material is well andwithout any damage before
theproduction.Pleasedonotusethematerialwhosepackageis broken;
2. Make sure that the pre-treatment of steel pIpe IS completely done before
coating;
3. Try to wash the extruder completely before coating. Be sure there is no other
adhesiveorHDPEleftoverintheextruder.
4. To achieve the bestperformance, apreheating ofHDPE in the heatingoven at
80C for2hourswouldbe appreciated.
5. We kindly recommend below processing temperature for your further
reference:
ltlll, iffl",./jIl&:ii/jlI:ltI&:IiUtlll22li} 020-82266168 8n66691
Guangzhou lusMnNew M .. Co..ltd. Web: www.cnlush ....com ftA, 020-82266450
j

A. Processing Temperature for Co Polymer Adhesive L-5R
Item
Feeding
Zone
Middle
Zone
Transition
Zone
Mould Head
Melt
Temperature
.
Processing
Temperature
CC)

B. Processing Temperature for HDPE EJ-l
Item
Feeding
Zone
Middle
Zone
Transition
Zone
Mould
Head
Melt
Temperature
Processing
Temperature
CC)
160"-'200 200"-'220
Guangzhou Lushan New Materials Co., Ltd.
02/0912013