* This is to be calculated every week physically the concrete produced per Min. Several trials to be taken and averaged. Variations # Actual productivity at site. Conc prod / Hrs run All Plants in the cluster to be shown irrespective of idle, Surplus, not commissioned or Breakdown NORMS PLANT Batching Plant - 30 cum/hr Batching Plant - 60 cum/hr
PROJECT
21
14
oduced per Min. Several trials to be taken and averaged. Variations if any must be analyzed for root cause
NT
t - 30 cum/hr
t - 60 cum/hr
TOTAL NO. HOURS TOTAL CONCRETE THE PLANT RUN PRODUCED FOR THE (FTM) MONTH (CUM)
NORMS (CUM)
164
2314
6500
Utility (%)
35.59%
12614.00
24
AVERAGE CONCRETE BALANCE CONCRTE NO OF MONTHS PRODUCED PER QUANTITY FOR THIS THIS PLANT MONTH IN THIS PROJECT WITH THIS FURTHER REQURIED PROJECT WITH THIS PLANT (CUM) IN THIS PROJECT PLANT(CUM)
526
47688
11
AVERAGE CONCRETE QTY PLANNED PER Job code Cluster MONTH WITH THIS PLANT
4400
LE100580
CNCL