BGR ENERGY SYSTEMS LTD. 2X660 MW IB THERMAL POWER PLANT , OPGC SITE Area / Location Grid Member Quantity of concrete A. Reinforcement 1 Conforms of Drawing 2 Binding / Welding Dia in mm 3 No. of chairs Types : : : a. b. c. 4 Cover Blocks provided 5 Splicing / Laps Dia in mm 6 No. of Splicing B Staging and Formwork 1 Staging Checked 2 Formwork to : YES / NO a. Line b. Level c. Plumb 3 4 C Formwork free of holes and gaps Formwork oil applied Embedded Item Type Fixed Preparation of Construction Joint Prepared and Cleaned for Concreteing : : YES / NO YES / NO Anchor Bolt Yes / No Shear Key Yes / No Inserts Yes / No : : : YES / NO YES / NO YES / NO : : : a. b. YES / NO YES / NO YES / NO YES / NO Nos.
: : : :
: : :
D 1
: : : :