activity cleaning the site

statement grader with blade 2.5 m

setting out the baoundary 1 survey engineer + 2 labor excavation manual cleaning covering nilon for foundation erect formwrok steel fixing concreting remove form work curing solid block above Foundation DPC back filling hollow block above DPC erect formwrok for ground floor slab fixing slab steels erect stair formwork fixing stair steels concreting curing from work removal houling block to first floor hollow block for first floor ground floor preparation leveling compacting fixinf steels concreting

FS=1

CONCRETE

7 1 1