Professional Documents
Culture Documents
It involved the design of a Sports Hall complex at Colyton Grammar School. As the facility is used by the school and the local community it was a jointly funded project between the Local Authority and the School. Classroom Extension View from All Weather Pitch The accomodation consists of a dance studio, school and public changing, shower and toilet facilities, reception area and main sports hall to Sports England's specification and requirements. The project was completed on time and on budget.
Inside Sports Hall looking towards Reception Reception Area and Changing Facilities
Completed: 2003 Contract Value: 980,00 Contractor: R.G. Spiller Ltd Structural Engineer: Anthony Ward Partnership Service Engineer: Sci-Entec Quantity Surveyor: Harris Rourke & Simpson Client: Colyton Grammar School & East Devon District Council
The design and running or this project was in conjunction with David Highet Architects in Axminster. P.S Architerture provided the design and detail drawings and the contract administration was provided by D.H Architects.